Skip to content

What are you looking for?


You may also like

Honeywell 51308105-400 C300 Controller Memory Backup ModuleHoneywell 51308105-400 C300 Controller Memory Backup ModuleHoneywell 51308105-400 C300 Controller Memory Backup Module
Honeywell 51308105-400 C300 Controller Memory Backup Module
Honeywell 51308105-400 C300 Controller Memory Backup Module
Honeywell 51308105-400 C300 Controller Memory Backup Module

Honeywell 51308105-400 C300 Controller Memory Backup Module


Only 10 left - Selling fast

PRODUCT SKU : 51308105-400

PRODUCT TYPE : RAM Charger Assemblies

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for volatile memory preservation in C300 Distributed Control System platforms, the Honeywell 51308105-400 (51308105-400 Controller Memory Backup Module) provides direct physical/electrical execution. Mounted directly on the controller hardware, the module sustains up to 128 MB of internal program parameters and runtime configurations across 1-2 physical S8 C300 units during electrical supply failure vectors.

Hardware Specifications

Parameter Specification
Model 51308105-400
Brand Honeywell
Origin United States
Weight 2.8 oz (approx. 80 g)
Dimensions 2.95 x 1.77 x 0.47 inches
Operating Temp Standard C300 system environment limits
Power Consumption Hosted by controller module interface
Memory Capacity 128 MB
Supported Controllers 1-2 physical S8 C300 units
System Compatibility C300 DCS

Honeywell DCS Channel-to-Channel Isolation Parameters

The memory backup architecture is engineered to operate in parallel with standard channel-to-channel isolation layers built into the Honeywell C300 terminal matrix. The physical grounding and shielded contacts isolate low-voltage backup energy paths from external field wiring common-mode disturbances, preventing electrical noise from affecting the 4-20 mA HART loop protocol handling channels during active failover sequences.

Frequently Asked Questions

Q: Can this memory backup module be hot-swapped while the primary S8 C300 controller is actively running control logic?

A: Yes, the mechanical and electrical interface allows for hot-swap maintenance under live system rack voltage conditions without disrupting localized controller bus performance.

Q: How many physical C300 controller nodes can be concurrently sustained by a single 51308105-400 unit?

A: The physical board routing layout is internally configured to support and bridge the backup voltage rails of 1-2 physical S8 C300 units simultaneously.

Field Installation Guidelines

  1. Align the 2.95 x 1.77 x 0.47 inches backup board module with the dedicated mounting footprint directly located on the C300 base assembly.
  2. Press the connection pins firmly into the mating socket until the structural retaining components click to secure the link against industrial plant vibration.
  3. Ensure that the cabinet grounding braid forms a low-impedance electrical interface to the main chassis earth terminal to limit transient risks.
  4. Execute standard software diagnostics through the engineering interface to verify that the 128 MB volatile memory cache registers clear status indicators.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more
Industrial Networking Essentials: Demystifying Hubs, Switches, and Routers in Control Systems

Industrial Networking Essentials: Demystifying Hubs, Switches, and Routers in Control Systems

Industrial automation relies heavily on robust networking infrastructure to connect programmable logic controllers (PLCs), distributed control systems (DCS), and human-machine interfaces (HMIs). Modern factory automation environments generate vast amounts of real-time operational data across deterministic networks. Understanding the structural differences between hubs, switches, and routers ensures optimal traffic segmentation, minimizes latency, and maintains high network availability.

Read more