Skip to content

What are you looking for?


You may also like

ABB UC D240 A101 3BHE022287R0101 Controller ModuleABB UC D240 A101 3BHE022287R0101 Controller ModuleABB UC D240 A101 3BHE022287R0101 Controller Module
ABB UC D240 A101 3BHE022287R0101 Controller Module
ABB UC D240 A101 3BHE022287R0101 Controller Module
ABB UC D240 A101 3BHE022287R0101 Controller Module

ABB UC D240 A101 3BHE022287R0101 Controller Module


Only 10 left - Selling fast

PRODUCT SKU : UC D240 A101 3BHE022287R0101

PRODUCT TYPE : Controller Modules

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The ABB 3BHE022287R0101, also cataloged as the UC D240 A101 Controller Module, operates as a dedicated hardware component for closed-loop execution and pulse generation within PEC800 excitation control system platforms. The unit processes fast logic calculations and hardware-level feedback signals to drive power electronic switches across excitation converters.

Hardware Specifications

Parameter Specification
Model 3BHE022287R0101 (UC D240 A101)
Brand ABB
Origin China
Weight 0.92 kg
Dimensions 270 mm x 30 mm x 247 mm (W x H x D)
Operating Temp 0 to +55 deg C
Power Consumption Standard backplane internal logic power load
Product Type Controller Modules
Internal Designator CCM 6080
Customs Tariff Code 85371092

Backplane Bus Communication Velocity & Deterministic Execution

The UC D240 A101 controller module leverages high backplane bus communication velocity to maintain real-time data exchange with peripheral I/O modules and firing circuits. Integrated processor logic manages cyclic execution tasks over deterministic network backplanes, ensuring synchronized gate-pulse distribution and minimal control loop latency. Onboard memory components maintain firmware flash compatibility across standard PEC800 control system revisions.

Frequently Asked Questions

Q: What primary role does the UC D240 A101 module fulfill within the control system?

A: The module executes main control algorithms, processing digitized field feedback and issuing real-time trigger commands to power converter gate drivers.

Q: Is hot-swapping supported for the UC D240 A101 controller assembly?

A: No, power supplies to the subrack and backplane bus must be isolated prior to removing or inserting the module to prevent electrical damage and system trips.

Q: How is frame grounding handled for the module?

A: The board establishes electrical grounding via its front panel fixing screws and conductive guide rails connected directly to the subrack frame chassis.

Field Installation Guidelines

  • Ensure all main and auxiliary power feeds to the controller subrack are disconnected before installation or replacement.
  • Wear an anti-static ESD wrist strap connected to cabinet frame ground prior to touching the module circuit board.
  • Slide the assembly carefully along the subrack card guides until the backplane connectors align and seat fully into the bus sockets.
  • Tighten all front panel retention screws to secure the module mechanically and ensure continuous chassis ground connection.
  • Verify that all communication and feedback cable shields are clamped to the cabinet earth bar to prevent high-frequency noise interference

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more