Skip to content

What are you looking for?


You may also like

ABB PFBK 164 Signal Processing Board 3BSE000469R1ABB PFBK 164 Signal Processing Board 3BSE000469R1ABB PFBK 164 Signal Processing Board 3BSE000469R1
ABB PFBK 164 Signal Processing Board 3BSE000469R1
ABB PFBK 164 Signal Processing Board 3BSE000469R1
ABB PFBK 164 Signal Processing Board 3BSE000469R1

ABB PFBK 164 Signal Processing Board 3BSE000469R1


Only 10 left - Selling fast

PRODUCT SKU : PFBK 164 3BSE000469R1

PRODUCT TYPE : Signal Processing Boards

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-accuracy load cell signal conditioning and transducer measurement in Pressductor force measurement systems, the ABB PFBK 164 3BSE000469R1 (PFBK 164 Signal Processing Boards) provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model PFBK 164
Part Number 3BSE000469R1
Brand ABB
Product Type Signal Processing Boards
Origin Sweden
Weight 0.45 kg
Dimensions Standard subrack board dimension (Eurocard format)
Operating Temp 0 to +55 deg C
Power Consumption Power supplied via backplane rack rail
Circuit Function Load cell excitation & analog transducer signal processing
System Integration ABB Pressductor Millmate / Load Cell Systems

Backplane Bus Communication Velocity and Signal Conditioning

The processing board houses analog filter circuits and excitation drivers tailored for magneto-elastic force transducers. Backplane interface logic transfers digitized weight and tension values at high transmission rates without reducing backplane bus communication velocity across adjacent subrack modules. Built-in firmware flash compatibility across control board revisions ensures synchronized signal filtering, drift compensation, and low-latency analog conversion across multi-channel weighing nodes.

Frequently Asked Questions

Q: Does the PFBK 164 board support live hot-swapping inside an active Pressductor subrack?

A: No, primary rack power must be isolated prior to extracting or inserting the board to protect sensitive analog-to-digital converter components from backplane voltage transients.

Q: How is chassis ground bonding established for the signal processing board?

A: Earth grounding is established through the metallic front panel plate and rear connector grounding pins when securely fastened into the subrack chassis.

Q: What power rail energizes the onboard processing circuitry?

A: The board receives regulated DC operating voltages directly from the dedicated backplane power supply bus of the control rack.

Field Installation Guidelines

  1. Turn off all main power sources feeding the control chassis before inserting or removing the PFBK 164 board.
  2. Wear an anti-static ESD wrist strap connected to cabinet earth ground before removing the board from its protective packaging.
  3. Align the circuit board with the chassis subrack card guides and push firmly until the rear edge connector seats fully into the backplane.
  4. Tighten the top and bottom front panel retaining screws to secure mechanical locking and chassis ground continuity.
  5. Route low-level transducer signal wires separately from high-voltage AC cables with a minimum spacing of 200 mm to suppress noise coupling.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more