Skip to content

What are you looking for?


You may also like

Schneider Electric Modicon Quantum 140CRP81100 PROFIBUS DP Interface ModuleSchneider Electric Modicon Quantum 140CRP81100 PROFIBUS DP Interface ModuleSchneider Electric Modicon Quantum 140CRP81100 PROFIBUS DP Interface Module
Schneider Electric Modicon Quantum 140CRP81100 PROFIBUS DP Interface Module
Schneider Electric Modicon Quantum 140CRP81100 PROFIBUS DP Interface Module
Schneider Electric Modicon Quantum 140CRP81100 PROFIBUS DP Interface Module

Schneider Electric Modicon Quantum 140CRP81100 PROFIBUS DP Interface Module


Only 10 left - Selling fast

PRODUCT SKU : 140CRP81100

PRODUCT TYPE : PROFIBUS DP Interface Module

PRODUCT VENDOR : Schneider


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Product Description

The 140CRP81100 from Schneider Electric is a high-performance PROFIBUS DP interface module designed for the Modicon Quantum series. It enables reliable and efficient communication between Quantum PLCs and PROFIBUS DP networks, providing robust integration for complex industrial control systems.

Technical Specifications

  • Model + Part Number: 140CRP81100

  • Manufacturer: Schneider Electric

  • Product Series: Modicon Quantum

  • Product Type: PROFIBUS DP Interface Module

  • Communication Protocol: PROFIBUS DP

  • Number of Ports: 1

  • Maximum Baud Rate: 12 Mbps

  • Bus Current Requirement: 350 mA

  • Power Dissipation: 1.85 W

  • Operating Temperature Range: 0°C to 60°C

  • Storage Temperature Range: -40°C to 85°C

  • Dimensions: 9.0 cm H × 32.0 cm W × 33.0 cm L

  • Weight: 0.99 lbs

Applications
The 140CRP81100 module is suitable for connecting Modicon Quantum PLCs to PROFIBUS DP networks in automation systems, enabling high-speed data exchange and network integration for manufacturing, process control, and industrial monitoring applications.

FAQ
Q: How many communication ports does this module have?
A: 1 PROFIBUS DP port.
Q: What is the maximum supported baud rate?
A: Up to 12 Mbps.
Q: What are the operating temperature limits?
A: 0°C to 60°C for operation and -40°C to 85°C for storage.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Wellhead Control Panel (WHCP) Architecture in Oil and Gas Automation

Wellhead Control Panel (WHCP) Architecture in Oil and Gas Automation

Upstream oil and gas operations rely on specialized field control platforms to manage wellhead extraction safety and hydraulic actuation. A Wellhead Control Panel (WHCP) serves as a dedicated hydraulic and pneumatic power unit designed to operate critical Christmas Tree isolation valves. By interfacing field safety components directly with Programmable Logic Controller (PLC) architecture, a WHCP protects upstream extraction assets against overpressure, catastrophic leaks, and thermal emergencies.

Read more
Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Industrial control system deployments rely on structured signal distribution to bridge field instrumentation with central processing hardware. A marshalling cabinet serves as the vital intermediate connection point between heavy field home-run multi-pair cables and delicate input/output (I/O) modules housed inside Programmable Logic Controller (PLC) or Distributed Control System (DCS) enclosures. By segregating field cable terminations from control hardware, engineers maintain system flexibility, safeguard controller components, and streamline commissioning workflows.

Read more
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more