Skip to content

What are you looking for?


You may also like

1747-C10 | Allen-Bradley SLC 500 6-Foot SLC Internal Communication Cable1747-C10 | Allen-Bradley SLC 500 6-Foot SLC Internal Communication Cable1747-C10 | Allen-Bradley SLC 500 6-Foot SLC Internal Communication Cable
1747-C10 | Allen-Bradley SLC 500 6-Foot SLC Internal Communication Cable
1747-C10 | Allen-Bradley SLC 500 6-Foot SLC Internal Communication Cable
1747-C10 | Allen-Bradley SLC 500 6-Foot SLC Internal Communication Cable

1747-C10 | Allen-Bradley SLC 500 6-Foot SLC Internal Communication Cable


Only 10 left - Selling fast

PRODUCT SKU : 1747-C10

PRODUCT TYPE : Communication Cable

PRODUCT VENDOR : Allen-Bradley


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Module Overview

The 1747-C10 is a specialized internal communication cable designed specifically for the Allen-Bradley SLC 500 modular hardware platform. This 6-foot cable is used to connect a 1747-DCM (Direct Communication Module) or a 1747-DMR module to a standard SLC 500 fixed controller or a modular SLC 5/01, 5/02, 5/03, 5/04, or 5/05 CPU. Unlike standard serial cables, the 1747-C10 is engineered with specific shielding and pinouts to facilitate high-speed data exchange across the SLC backplane architecture, ensuring deterministic performance for distributed I/O and peer-to-peer messaging.

Detailed Engineering Specifications

The 1747-C10 is a ruggedized industrial cable built to withstand the electrical noise and physical rigors of a control cabinet environment.

  • Product Type: Communication Cable

  • Product Family: SLC 500

  • Length: 6 Feet (1.83 meters)

  • Connector Type: 10-pin linear connector to 10-pin linear connector

  • Wire Gauge: 24 AWG (standard industrial grade)

  • Shielding: Foil and braid for high-frequency noise immunity

  • Compatible Modules: 1747-DCM, 1747-DMR, and SLC 500 Chassis

  • Jacket Material: Industrial-grade PVC (oil and chemical resistant)

  • Operating Temperature: 0°C to 60°C (32°F to 140°F)

  • Physical Weight: 0.20 lbs (0.09 kg)

Network and System Integration

The primary use of the 1747-C10 is to bridge the communication gap between a "Master" PLC-5 or SLC 5/04 and a "Slave" SLC chassis via a Direct Communication Module. In this configuration, the cable carries the Remote I/O (RIO) or Data Highway Plus (DH+) signals from the DCM module to the local processor's internal bus. This allows the slave SLC to appear as a single I/O rack to the master controller, enabling complex distributed control strategies without the need for extensive long-distance wiring.

Installation Best Practices

When installing the 1747-C10, ensure the following to maintain signal integrity:

  • Strain Relief: Use the integrated cable ties or clips to secure the 10-pin connectors. The pins on SLC modules are delicate, and excessive tension can lead to intermittent "Rack Faults."

  • Routing: Avoid routing the communication cable parallel to high-voltage AC lines or Variable Frequency Drive (VFD) output cables. If the cable must cross power lines, ensure it does so at a 90° angle.

  • Seating: Confirm the connector is fully seated and the locking tabs (if applicable) are engaged. A loose 1747-C10 can cause "Communication Lost" errors in the processor status file.

Technical FAQ

Can I use the 1747-C10 as a programming cable for my SLC 5/03?

No. The 1747-C10 is an internal module-to-processor cable. For programming an SLC 5/03 via the RJ45 (DH-485) port, you would require a 1747-PIC or 1747-UIC converter. For the DB9 (RS-232) port, a 1747-CP3 null-modem cable is needed.

What is the difference between the 1747-C10 and 1747-C11?

The only difference is the length. The 1747-C10 is 6 feet long, while the 1747-C11 is shorter (typically 1 foot), intended for modules located in the same or adjacent chassis.

Is this cable hot-swappable?

While the cable is passive, disconnecting it while the SLC processor is in "Run" mode will likely result in an immediate major fault (non-recoverable) and a halt of the control program. Always place the CPU in "Program" mode or remove power before changing communication cables.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Industrial control system deployments rely on structured signal distribution to bridge field instrumentation with central processing hardware. A marshalling cabinet serves as the vital intermediate connection point between heavy field home-run multi-pair cables and delicate input/output (I/O) modules housed inside Programmable Logic Controller (PLC) or Distributed Control System (DCS) enclosures. By segregating field cable terminations from control hardware, engineers maintain system flexibility, safeguard controller components, and streamline commissioning workflows.

Read more
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more