FS-SICC-0001/L7 Honeywell System Interconnection CableFS-SICC-0001/L7 Honeywell System Interconnection CableFS-SICC-0001/L7 Honeywell System Interconnection Cable
FS-SICC-0001/L7 Honeywell System Interconnection Cable
FS-SICC-0001/L7 Honeywell System Interconnection Cable
FS-SICC-0001/L7 Honeywell System Interconnection Cable

FS-SICC-0001/L7 Honeywell System Interconnection Cable


Only 10 left - Selling fast

PRODUCT SKU : FS-SICC-0001/L7

PRODUCT TYPE : Interconnection Cables

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-integrity inter-rack signal routing in FSC and Experion systems, the Honeywell FS-SICC-0001/L7 (FS-SICC-0001 System Interconnection Cable) provides direct physical/electrical execution. It links chassis modules using a factory-terminated 20-core conductor path across a 7 m length.

Hardware Specifications

Parameter Specification
Model FS-SICC-0001/L7
Brand Honeywell
Origin USA
Weight 0.8 kg
Dimensions Outer Diameter Approx 9.93 mm x 7 m
Operating Temp -20 to +60 deg C
Power Consumption Passive interconnect assembly (Zero internal power draw)
Cable Type 20-core, AWG 22 (approx 0.34 mm2)
Shielding Double-shielded for EMI/RFI protection
Connector Type Factory-terminated for Honeywell chassis modules
System Compatibility Honeywell FSC and Experion systems

Process Control & DCS Signal Interconnection Characteristics

The FS-SICC-0001/L7 cable assembly features channel-to-channel isolation principles to suppress electromagnetic interference and radio frequency noise across industrial control environments. Utilizing double-shielded AWG 22 conductors, the physical cable layer limits signal attenuation and cross-talk during parallel routing. The assembly transports discrete safety telemetry and 4-20 mA HART loop protocol field signals between central processing racks and remote termination sub-assemblies without line distortion over the 7 m span.

Frequently Asked Questions

Q: Can the FS-SICC-0001/L7 cable be disconnected while the host system remains powered?

A: Disconnection during active operation is permissible only within parallel redundant communication configurations; removing a single-channel cable severs active I/O communication to the central controller.

Q: How does double-shielding impact signal integrity in high-EMI noise environments?

A: The outer foil and braided shield layers isolate internal AWG 22 conductors from external high-frequency electrical fields, preventing induced voltages from corrupting low-level analog loops.

Field Installation Guidelines

  1. Routing and Bending Limits: Route the cable assembly through dedicated wire trays or conduit. Maintain a minimum static bending radius of 60 mm to avoid damaging the outer jacket or internal foil shield.
  2. Connector Engagement: Align factory-terminated pin headers precisely with chassis module connectors before applying seating force. Secure mechanical retention screws to maintain a vibration-proof electrical contact.
  3. Shield Grounding: Ensure shield drain terminations bond to the cabinet main earth bar at a single grounding point to eliminate ground potential loops.
  4. Power Line Segregation: Maintain a minimum 30 cm separation distance between the interconnection cable and high-voltage AC power wiring within cabinet raceways.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more