Skip to content

What are you looking for?


You may also like

Foxboro P0926KN Power Cable AssemblyFoxboro P0926KN Power Cable AssemblyFoxboro P0926KN Power Cable Assembly
Foxboro P0926KN Power Cable Assembly
Foxboro P0926KN Power Cable Assembly
Foxboro P0926KN Power Cable Assembly

Foxboro P0926KN Power Cable Assembly


Only 10 left - Selling fast

PRODUCT SKU : P0926KN

PRODUCT TYPE : Power Cables and Harnesses

PRODUCT VENDOR : Foxboro


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for power distribution in Foxboro I/A Series system enclosures, the Foxboro P0926KN (P0926KN Power Cable) provides direct physical/electrical execution for interconnecting power supply rails and Fieldbus Processor Modules (FPM). Built as a 3-pin to 3-pin connector assembly spanning 60 inches (152 cm), it routes regulated DC power between internal distribution sockets.

Hardware Specifications

Parameter Specification
Model P0926KN
Brand Foxboro
Origin USA
Weight 0.14 kg (0.30 lbs)
Dimensions 60 inches (152 cm) length
Operating Temp -20 deg C to +70 deg C
Power Consumption Passive wiring assembly (0 W)
Connector Type 3-pin to 3-pin system connector
Cable Type FPM Power Cable
Compatibility Foxboro I/A Series FPM modules

Channel-to-Channel Isolation and Loop Protocol Connectivity

The Foxboro P0926KN assembly uses high-dielectric insulation barriers across all conductors to maintain physical isolation between DC power lines and nearby I/O backplane communication paths. This construction minimizes switching ripple noise coupling into adjacent 4-20 mA HART loop protocol field wiring, preventing cold junction compensation (CJC) offsets on surrounding temperature sensing modules.

Frequently Asked Questions

Q: What is the primary connection purpose of the P0926KN cable assembly?

A: The P0926KN connects 3-pin DC power outputs to Fieldbus Processor Module (FPM) power receptacles within Foxboro I/A Series racks.

Q: Is hot-unplugging allowed for the P0926KN power cable during live operation?

A: De-energize the power feed prior to disconnecting the cable to avoid electrical arcing and connector pin degradation.

Field Installation Guidelines

Verify that all power sources to the targeted enclosure bus are isolated before connecting or removing the P0926KN cable. Inspect the 3-pin connectors on both ends to ensure alignment pins and locking mechanisms are free of debris or mechanical distortion.

Insert the 3-pin connectors firmly into the mating power distribution socket and FPM receptacle until latching mechanisms seat securely. Lay the 60-inch cable within designated cabinet wiring ducts, observing minimum bend radius limits to prevent wire strain. Maintain ground bonding on enclosure structural frames and confirm all conduit entries achieve a minimum of 5 full threads of engagement on NPT fittings.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more