Skip to content

What are you looking for?


You may also like

IC200ERM001C GE VersaMax Isolated Expansion Receiver ModuleIC200ERM001C GE VersaMax Isolated Expansion Receiver ModuleIC200ERM001C GE VersaMax Isolated Expansion Receiver Module
IC200ERM001C GE VersaMax Isolated Expansion Receiver Module
IC200ERM001C GE VersaMax Isolated Expansion Receiver Module
IC200ERM001C GE VersaMax Isolated Expansion Receiver Module

IC200ERM001C GE VersaMax Isolated Expansion Receiver Module


Only 10 left - Selling fast

PRODUCT SKU : IC200ERM001C

PRODUCT TYPE : Bus Expansion Modules

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The GE IC200ERM001C, also cataloged as the IC200ERM001 Isolated Expansion Receiver Module, operates as a dedicated hardware component for multi-rack I/O bus expansion and signal isolation within GE VersaMax control platforms.

Hardware Specifications

Parameter Specification
Model IC200ERM001C
Brand GE (GE Fanuc / Emerson)
Origin USA
Weight 0.23 kg (0.50 lbs)
Power Consumption Power sourced via backplane power supply
Max Backplane Output Voltage 5 VDC
Min Backplane Output Voltage 3.3 VDC
Expansion Connectors 2 female 26-pin D-shell ports
Rack ID Selection Onboard rotary switch
Status Indicators LEDs for Power Status and Expansion Bus Status
Mounting Location Far-left slot on VersaMax expansion rack DIN rail

Backplane Bus Communication Velocity & Deterministic Network Execution

The IC200ERM001C receives isolated expansion bus signals from an upstream expansion transmitter module (such as the ETM001) via its top 26-pin D-shell port. It rebuilds and routes local backplane voltage levels between 3.3 VDC and 5 VDC to power downstream I/O and communication modules installed on the expansion rack, optimizing backplane bus communication velocity across long distances.

The bottom female 26-pin D-shell port enables daisy-chain connections to subsequent expansion racks or accommodates an expansion bus terminator plug on the final node. Full integration into Profinet / EtherNet/IP deterministic network topologies is maintained through the primary controller interface, while strict firmware flash compatibility ensures synchronized scan execution and low-latency protocol passthrough across all extended racks.

Frequently Asked Questions

Q: What is the functional role of the rotary switch located on the IC200ERM001C module?

A: The rotary switch located under the front access door sets the unique hardware address (Rack ID) for the specific expansion rack within the system topology.

Q: How are the two 26-pin female D-shell ports utilized on the expansion receiver module?

A: The top D-shell port receives the expansion cable from the upstream transmitter or preceding receiver, while the bottom port daisy-chains to the next expansion rack or houses a bus termination plug on the final rack.

Q: Can the IC200ERM001C module be removed or inserted while the expansion rack power supply is energized?

A: No. All incoming power sources to the expansion rack and primary controller must be de-energized prior to removing or installing the module to prevent electrical damage to the expansion bus.

Field Installation Guidelines

  1. Power Shutdown: De-energize and lock out all power sources feeding the host system and the expansion rack backplane prior to installation or maintenance.
  2. Rack Position: Mount the IC200ERM001C module exclusively in the far-left slot position of the VersaMax expansion rack on the 35 mm DIN rail.
  3. Address Configuration: Set the onboard rotary switch to the assigned expansion rack ID number prior to securing the module onto the backplane carrier.
  4. Cable Interconnection: Secure the 26-pin expansion cable from the upstream transmitter into the top D-shell port using integrated thumbscrews. Attach a daisy-chain cable or terminal plug to the bottom D-shell port.
  5. Electrostatic Discharge (ESD): Wear a grounded anti-static wrist strap attached to the enclosure metallic earth during installation to protect onboard IC logic from static damage.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more