Skip to content

What are you looking for?


You may also like

NKTU01-L9 ABB Bailey INFI 90 Termination Unit CableNKTU01-L9 ABB Bailey INFI 90 Termination Unit CableNKTU01-L9 ABB Bailey INFI 90 Termination Unit Cable
NKTU01-L9 ABB Bailey INFI 90 Termination Unit Cable
NKTU01-L9 ABB Bailey INFI 90 Termination Unit Cable
NKTU01-L9 ABB Bailey INFI 90 Termination Unit Cable

NKTU01-L9 ABB Bailey INFI 90 Termination Unit Cable


Only 10 left - Selling fast

PRODUCT SKU : NKTU01-L9

PRODUCT TYPE : DCS Termination Cables

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The ABB NKTU01-L9, also cataloged as the NKTU01-L9 Termination Unit Cable, operates as a dedicated hardware component for low-voltage signal transmission and serial interconnectivity within ABB Bailey INFI 90 DCS platforms. The 9-foot assembly bridges I/O modules directly to termination units such as the NTMP01, routing RS-232-C and RS-485 serial communication vectors through factory-terminated pin headers without intermediate wire splicing.

Hardware Specifications

Parameter Specification
Model NKTU01-L9
Brand ABB
Origin Sweden
Weight 1.0 kg
Dimensions Length: 9 ft (approx. 2.74 m)
Operating Temp -40 deg C to +70 deg C
Power Consumption Passive physical connection (24 VDC nominal signal level)
System Compatibility ABB Bailey INFI 90 DCS
Function Connects I/O modules to termination units (e.g., NTMP01)
Supported Protocols RS-232-C, RS-485
Cable Construction Shielded twisted-pair, EMI-protected insulation
Connector Type Factory-terminated multi-pin connectors
Jacket Rating Vibration-resistant, moisture-tolerant, UV-stable

Deterministic Network Routing & Communication Integrity

Engineered specifically for the Bailey INFI 90 system architecture, the NKTU01-L9 cable maintains backplane bus communication velocity across high-density I/O frames. Built-in shielded twisted-pair conductors suppress electromagnetic interference (EMI) and cross-talk, preserving deterministic serial data transfer between primary process controllers and field termination modules. Cable signal propagation latency is minimized to sustain real-time I/O scanning updates across localized cabinet network topologies.

Frequently Asked Questions

Q: Can the factory-terminated connectors on the NKTU01-L9 cable be hot-swapped while the system is online?

A: Disconnection or connection of the termination cable must be conducted only when the corresponding I/O channel or termination unit power is isolated to prevent transient communication faults or module bus reset cycles.

Q: How is shield ground continuity handled through the NKTU01-L9 cable connectors?

A: The internal drain wire and overall braided shield connect directly to the ground pins on the factory-molded connector shells, establishing an unbroken shield path from the I/O module to the termination unit frame ground.

Q: What is the maximum voltage rating permitted across the serial conductor pairs?

A: The internal insulation and conductor geometry are rated for low-voltage control signals operating at a nominal 24 VDC levels.

Field Installation Guidelines

Follow standard industrial cabling practices when deploying the termination unit cable:

  1. Cable Routing: Route the cable through dedicated low-voltage wiring trays, maintaining a minimum clearance of 300 mm from high-voltage AC power leads or variable frequency drive outputs to avoid electromagnetic coupling.
  2. Bend Radius Limits: Respect the minimum dynamic bend radius during installation; do not bend the assembly sharply near the factory-molded strain relief boots.
  3. Connector Seating: Align the connector keyways carefully with the mating header on the I/O module or NTMP01 termination unit. Push straight until the mechanical locking latches fully engage.
  4. Strain Relief: Secure the cable bundle using nylon ties adjacent to the termination assembly to prevent direct mechanical stress on the module connector faces under cabinet vibration.


Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding VFD Mechanical Brake Logic and Control in Industrial Automation

Understanding VFD Mechanical Brake Logic and Control in Industrial Automation

Variable Frequency Drives (VFDs) play a crucial role in modern industrial automation by controlling motor speed, torque, and acceleration. However, high-inertia loads and vertical lifting systems require precise mechanical braking logic to ensure operational safety and prevent equipment damage.

Read more
Why Programmable Logic Controllers Drop into Stop Mode: An Expert Analysis

Why Programmable Logic Controllers Drop into Stop Mode: An Expert Analysis

Industrial automation systems rely heavily on Programmable Logic Controllers (PLCs) to maintain uninterrupted production. When a PLC unexpectedly shifts from Run to Stop mode, whole manufacturing lines stall.

As control systems evolve across modern factory automation, understanding the root causes of these interruptions helps engineers minimize costly downtime. This technical guide breaks down why PLCs trip into Stop mode and provides practical strategies to mitigate system faults.

Read more
Understanding Root Causes of Unplanned PLC Stop Mode in Industrial Automation

Understanding Root Causes of Unplanned PLC Stop Mode in Industrial Automation

Modern Programmable Logic Controllers manage execution through distinct operational states: Run, Stop, Start-Up, and Hold. During power-up, a controller initializes memory registers within Stop mode before briefly transitioning to Start-Up mode. During this phase, internal self-diagnostics evaluate system integrity across hardware and user programs. If the controller detects no critical faults, it enters Run mode to execute the control program continuously. However, any severe system anomaly forces the CPU back into Stop mode immediately to prevent erratic machine behavior across the plant floor.

Read more