Skip to content

What are you looking for?


You may also like

Honeywell DU-PWPR21 HART Analog Output ModuleHoneywell DU-PWPR21 HART Analog Output ModuleHoneywell DU-PWPR21 HART Analog Output Module
Honeywell DU-PWPR21 HART Analog Output Module
Honeywell DU-PWPR21 HART Analog Output Module
Honeywell DU-PWPR21 HART Analog Output Module

Honeywell DU-PWPR21 HART Analog Output Module


Only 10 left - Selling fast

PRODUCT SKU : DU-PWPR21

PRODUCT TYPE : Analog Output Modules

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The Honeywell DU-PWPR21, also cataloged as the DU-PWPR21 HART Analog Output Module, operates as a dedicated hardware component for multi-channel field control signal synthesis within Honeywell Experion Series C I/O platforms.

Hardware Specifications

Parameter Specification
Model DU-PWPR21
Brand Honeywell
Origin USA
Weight 3.0 kg
Operating Temp -40 to +70 deg C
Power Consumption Powered via I/O termination assembly backplane
Signal Output Type Current loop / Analog output
Protocol Support 4-20 mA HART loop protocol
Isolation Galvanic channel-to-channel and system isolation
System Compatibility Experion PKS platforms

4-20 mA HART Loop Protocol & Channel Isolation

The module generates analog current signals to drive final control elements while maintaining galvanic channel-to-channel isolation to prevent ground loop currents from interfering with system backplane electronics. The internal signal processing pathways support transparent digital Frequency-Shift Keying (FSK) modulation overlays compliant with the 4-20 mA HART loop protocol. This enables bi-directional passthrough of field instrument diagnostics, device status, and configuration data without causing signal distortion on the primary current loop.

Frequently Asked Questions

Q: How does the channel-to-channel isolation in the DU-PWPR21 protect system loop integrity?

A: Galvanic channel-to-channel isolation electrically decouples each output loop, preventing ground potential differences and stray field currents from cross-coupling between channels or feeding back into the system backplane.

Q: Does the module interfere with HART digital communication signals when driving 4-20 mA current outputs?

A: No, the onboard output circuitry maintains constant impedance across the HART FSK frequency band, enabling uninterrupted bi-directional HART communication alongside primary current signals.

Field Installation Guidelines

  1. Ensure the I/O rack or mounting chassis is de-energized or operating under authorized hot-swap conditions prior to module insertion.
  2. Align the module housing with the backplane guide slots and push firmly until the retention latches fully click into place.
  3. Terminate signal wiring at the dedicated field termination assembly, maintaining separation between low-voltage signal lines and AC power cables.
  4. Ground all shielded twisted-pair cable drain wires at a single cabinet earth point to minimize high-frequency noise coupling.
  5. Confirm that the total loop load resistance on each active current channel remains within the designated module driving limits.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Wellhead Control Panel (WHCP) Architecture in Oil and Gas Automation

Wellhead Control Panel (WHCP) Architecture in Oil and Gas Automation

Upstream oil and gas operations rely on specialized field control platforms to manage wellhead extraction safety and hydraulic actuation. A Wellhead Control Panel (WHCP) serves as a dedicated hydraulic and pneumatic power unit designed to operate critical Christmas Tree isolation valves. By interfacing field safety components directly with Programmable Logic Controller (PLC) architecture, a WHCP protects upstream extraction assets against overpressure, catastrophic leaks, and thermal emergencies.

Read more
Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Industrial control system deployments rely on structured signal distribution to bridge field instrumentation with central processing hardware. A marshalling cabinet serves as the vital intermediate connection point between heavy field home-run multi-pair cables and delicate input/output (I/O) modules housed inside Programmable Logic Controller (PLC) or Distributed Control System (DCS) enclosures. By segregating field cable terminations from control hardware, engineers maintain system flexibility, safeguard controller components, and streamline commissioning workflows.

Read more
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more