Skip to content

What are you looking for?


You may also like

Honeywell 51304540-200 Communication ModuleHoneywell 51304540-200 Communication ModuleHoneywell 51304540-200 Communication Module
Honeywell 51304540-200 Communication Module
Honeywell 51304540-200 Communication Module
Honeywell 51304540-200 Communication Module

Honeywell 51304540-200 Communication Module


Only 10 left - Selling fast

PRODUCT SKU : 51304540-200

PRODUCT TYPE : Communication Modules

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for data transmission within TDC 3000 control architectures, the Honeywell 51304540-200 (51304540-200 LCNE2 Paddle Board) provides direct physical execution of network communication between the Local Control Network (LCN) and station components.

Hardware Specifications

Parameter Specification
Model 51304540-200
Brand Honeywell
Weight 0.43 kg
Module Type LCNE2 Paddle Board
Compatibility TDC 3000 Series

DCS Process Control and Connectivity

The 51304540-200 module acts as a communication interface within the TDC 3000 environment, facilitating data packet routing between the control network and localized station hardware. The assembly features channel-to-channel isolation on the backplane interface, which limits electromagnetic interference (EMI) transmission between the communication bus and local module circuitry. This isolation maintains the integrity of high-speed data frames and prevents backplane-level ground loops from inducing communication errors. By offloading specific communication protocol tasks, the module ensures consistent latency for critical control loops, supporting integration with 4-20 mA HART loop protocol instruments when bridged through the network interface.

Frequently Asked Questions

Q: Does this module support hot-swapping within the TDC 3000 rack?

A: No. The 51304540-200 is not designed for hot-swapping. Removal or installation while the rack is powered will induce bus voltage transients, which may result in communication loss, processor re-initialization, or permanent damage to the board's interface components.

Q: How is the module linked to the LCN network?

A: The module is designed as a paddle board interface that connects directly to the network bus via designated station backplane slots. Ensure all connection pins are free of oxidation and the board is firmly seated to prevent intermittent signal loss.

Field Installation Guidelines

  1. Ensure the station rack is completely de-energized and all power sources are isolated before handling the module.
  2. Align the paddle board with the dedicated backplane slot guides and insert slowly to avoid mechanical stress on the interface pins.
  3. Apply uniform pressure to the board face to seat the edge connector fully into the backplane socket.
  4. Secure any auxiliary retention hardware to the rack frame to maintain mechanical stability and ensure effective grounding of the module chassis.
  5. Confirm network communication status through the station diagnostic interface once the system has been re-powered to verify link synchronization.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Optimizing Tank Level Control Using Proportional Algorithms in PLC Systems

Optimizing Tank Level Control Using Proportional Algorithms in PLC Systems

Industrial automation engineers frequently encounter liquid level regulation challenges across diverse process plants. Traditional ON-OFF control mechanisms often disrupt system stability due to abrupt actuator switching. Therefore, upgrading to closed-loop architectures like proportional control yields smoother responses. In a typical PLC environment, such as Siemens TIA Portal, engineers utilize closed-loop feedback to minimize process errors without requiring full PID complexity.

Read more
Understanding Why Your PLC Enters Stop Mode: Causes and Troubleshooting

Understanding Why Your PLC Enters Stop Mode: Causes and Troubleshooting

In industrial automation, programmable logic controllers (PLCs) serve as the core intelligence of modern factory automation and distributed control systems (DCS). Understanding how a PLC transitions between modes is vital for maintenance engineers. Typically, a PLC operates across four primary modes: Run, Stop, Start-Up, and Hold. When power is applied, the system immediately boots into Stop mode before initiating the Start-Up sequence. If the controller encounters a critical error during execution, it automatically reverts to Stop mode to prevent equipment damage. Therefore, monitoring these state transitions helps technicians maintain high system availability.

Read more
Comprehensive Guide to Servo Motor Drive Control Techniques in Industrial Automation

Comprehensive Guide to Servo Motor Drive Control Techniques in Industrial Automation

Precision motion control systems drive high-throughput manufacturing across modern industrial automation environments. Unlike standard induction motors running on basic variable frequency drives, servo motor systems deliver sub-millimeter positioning accuracy and fast dynamic response.

Read more