Skip to content

What are you looking for?


You may also like

Honeywell 51202901-100 C300 Wire Harness ConnectorHoneywell 51202901-100 C300 Wire Harness ConnectorHoneywell 51202901-100 C300 Wire Harness Connector
Honeywell 51202901-100 C300 Wire Harness Connector
Honeywell 51202901-100 C300 Wire Harness Connector
Honeywell 51202901-100 C300 Wire Harness Connector

Honeywell 51202901-100 C300 Wire Harness Connector


Only 10 left - Selling fast

PRODUCT SKU : 51202901-100

PRODUCT TYPE : PLC Communication Cables

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The Honeywell 51202901-100, also cataloged as the 51202901 2-Wire Wire Harness Connector, operates as a dedicated hardware component for connecting Honeywell C300 controllers to external devices within Honeywell Experion PKS platforms. Configured for low-voltage signal transmission across control panels, the harness establishes physical point-to-point continuity utilizing 22 AWG wiring interfaces linked via a standard D-6 connector form factor.

Hardware Specifications

Parameter Specification
Model 51202901-100 REV: B
Brand Honeywell
Origin USA
Weight Standard wire harness assembly weight footprint
Dimensions Multi-length 2-wire enclosure routing dimension
Operating Temp -40 to 85 deg C
Power Consumption Passive distribution component (Zero active load)
Connector Type D-6
Number of Wires 2
Wire Gauge 22 AWG
Contact Material Gold-plated
Humidity 0% to 95% RH (non-condensing)

Honeywell DCS Channel-to-Channel Isolation Parameters

The connector pin distribution maintains standard channel-to-channel isolation parameters when mated with C300 high-density I/O termination structures. The gold-plated contact pins deliver stable surface resistance limits, which prevents potential cross-talk or impedance shifts from degrading discrete field instrumentation signals or high-frequency data loops utilizing the 4-20 mA HART loop protocol.

Frequently Asked Questions

Q: Can this wire harness assembly be disconnected while the host C300 controller is actively online?

A: No, unlatching an energized signal or power circuit can drop active field status readings and trigger controller system fault states; loop power must be isolated prior to physical connector extraction.

Q: What physical maintenance parameters govern the gold-plated contact surfaces?

A: The gold plating prevents corrosion oxidation in high-humidity zones; maintenance actions are restricted to ensuring mechanical seating without the application of conductive sprays or physical abrasives.

Field Installation Guidelines

  1. Route the 22 AWG wire harness through dedicated internal cabinet wireways, keeping it physically isolated from heavy three-phase AC distribution lines.
  2. Align the D-6 connector interface keys with the C300 baseplate socket matrix to avoid pin bending during physical mating.
  3. Push the connector assembly firmly into the terminal interface until the structural locking tabs engage completely against industrial vibration vectors.
  4. Secure cable strain relief points near the harness exit path to eliminate dynamic tensile stress on the gold-plated termination crimps.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Demystifying the DDE Protocol in Legacy Industrial Automation Systems

Demystifying the DDE Protocol in Legacy Industrial Automation Systems

Modern control systems rely heavily on seamless interprocess communication to exchange operational data between software programs. Microsoft first introduced the Dynamic Data Exchange (DDE) protocol in 1987 to enable real-time data sharing. In factory automation, DDE served as an early bridge between control software and Windows desktop applications. Therefore, understanding DDE mechanics provides crucial insights into how legacy industrial networks established software-level connectivity.

Read more
Demystifying CPU Communication Ports in Siemens PLC Architectures

Demystifying CPU Communication Ports in Siemens PLC Architectures

Industrial automation relies heavily on robust data exchange between devices. Without seamless connectivity, field instruments, network switches, human-machine interfaces, and programmable logic controllers cannot coordinate effectively. Therefore, understanding the various CPU communication ports available in Siemens hardware ensures efficient factory automation design and seamless system integration.

Read more
Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Industrial automation relies heavily on programmable logic controllers (PLCs) to manage complex manufacturing processes. Many engineers dive straight into programming without mastering the underlying architecture. However, understanding how a PLC CPU executes a program ensures reliable system design. Therefore, mastering the scan cycle optimizes both performance and troubleshooting in modern control systems.

Read more