Skip to content

What are you looking for?


You may also like

Honeywell 2MLR-AC12 MasterLogic-200 Power ModuleHoneywell 2MLR-AC12 MasterLogic-200 Power ModuleHoneywell 2MLR-AC12 MasterLogic-200 Power Module
Honeywell 2MLR-AC12 MasterLogic-200 Power Module
Honeywell 2MLR-AC12 MasterLogic-200 Power Module
Honeywell 2MLR-AC12 MasterLogic-200 Power Module

Honeywell 2MLR-AC12 MasterLogic-200 Power Module


Only 10 left - Selling fast

PRODUCT SKU : 2MLR-AC12

PRODUCT TYPE : Power Supply Modules

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The Honeywell 2MLR-AC12, also cataloged as the 2MLR-AC12 Power Module, operates as a dedicated hardware component for internal logic voltage regulation within MasterLogic-200 PLC systems. Configured to convert a nominal 110 VAC input to a regulated 5 VDC output rail at up to 5.5 A, it directly energizes backplane data buses and active rack slots.

Hardware Specifications

Parameter Specification
Model 2MLR-AC12
Brand Honeywell
Origin Industrial Standard Assembly
Weight 0.326 kg
Dimensions 5.5 x 9.5 x 9.0 cm
Operating Temp 0 to 55 deg C
Power Consumption Output Power: 27.5 W at 55 deg C
Input Voltage Range 85-132 VAC (110 VAC nominal), 47-63 Hz
Output Voltage 5 VDC (+2%)
Output Current 5.5 A (Overcurrent protection: 6.0 A to 13.0 A)
Inrush Current 20 A peak (<8 ms)
Interruption Hold Time <20 ms
Relay RUN Output 24 VDC, 0.5 A (Min load: 5 VDC, 1 mA)

Channel-to-Channel Isolation & DCS Signal Integrity

The 2MLR-AC12 features galvanically isolated power conversion stages to shield backplane logic communication from AC mains transients, noise, and common-mode offsets. By maintaining continuous channel-to-channel isolation between field supply terminals and rack logic paths, the unit prevents ground loops from corrupting sensitive process telemetry, including 4-20 mA HART loop protocol signals and analog input module channels operating across the DCS infrastructure.

Frequently Asked Questions

Q: How does the RUN contact output operate on the 2MLR-AC12?

A: The RUN relay contact remains closed when the internal 5 VDC rail output functions within normal voltage tolerances. If output voltage falls below critical operating thresholds or power fails, the contact opens with a response time of less than 12 ms to signal a system diagnostic fault.

Q: What size wiring and terminals are supported by the power input terminal block?

A: The input connection terminals accept stranded copper wire sizes ranging from 0.75 to 2 mm² and are compatible with RAV1.25-3.5 and RAV2-3.5 ring/spade clamped terminals.

Q: How does the module react to short-term AC line power dips?

A: Integrated input storage filtering provides instantaneous interruption handling of up to 20 ms without dropping the primary 5 VDC backplane logic output.

Field Installation Guidelines

  1. Ensure the AC power feed is fully isolated before connecting 110 VAC supply leads to the module terminal strip.
  2. Crimp input power wiring using specified RAV1.25-3.5 or RAV2-3.5 clamped terminals to guarantee vibration-proof electrical contact.
  3. Connect the ground wiring conductor directly to the panel frame earth ground terminal to minimize line noise and suppress transients.
  4. Maintain proper convective cooling clearances above and below the module rack chassis to prevent thermal trip degradation at maximum 55 deg C operating environments.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Industrial control system deployments rely on structured signal distribution to bridge field instrumentation with central processing hardware. A marshalling cabinet serves as the vital intermediate connection point between heavy field home-run multi-pair cables and delicate input/output (I/O) modules housed inside Programmable Logic Controller (PLC) or Distributed Control System (DCS) enclosures. By segregating field cable terminations from control hardware, engineers maintain system flexibility, safeguard controller components, and streamline commissioning workflows.

Read more
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more