Skip to content

What are you looking for?


You may also like

51454460-200 Honeywell Series 8 Mounting Plate51454460-200 Honeywell Series 8 Mounting Plate51454460-200 Honeywell Series 8 Mounting Plate
51454460-200 Honeywell Series 8 Mounting Plate
51454460-200 Honeywell Series 8 Mounting Plate
51454460-200 Honeywell Series 8 Mounting Plate

51454460-200 Honeywell Series 8 Mounting Plate


Only 10 left - Selling fast

PRODUCT SKU : 51454460-200

PRODUCT TYPE : Mounting Plates

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The Honeywell 51454460-200, also cataloged as the 51454460-200 Mounting Plate, operates as a dedicated hardware component for mechanical base assembly and chassis securing within Honeywell Series 8 control system architectures.

Hardware Specifications

Parameter Specification
Model 51454460-200
Brand Honeywell
Origin United States
Weight 0.56 kg (1.23 lbs)
Dimensions 3.0 cm x 31.3 cm x 27.8 cm (1.2 in x 12.3 in x 11.0 in)
Operating Temp -40 to +70 deg C
Power Consumption Passive mechanical hardware (0 W)
Module Type Mounting Plates
Mounting Design Standard 3-column design
System Compatibility Honeywell Series 8

Channel-to-Channel Isolation and Mechanical Chassis Stability

Designed in strict compliance with Honeywell Series 8 structural standards, the 51454460-200 mounting plate provides a rigid physical foundation that suppresses vibration induced on internal bus structures. The metallic structural frame establishes continuous low-impedance earth bonding across installed I/O carriers, preventing static buildup from reaching sensitive control logic. Differential grounding points and cold junction compensation terminal positions on supported IOTA hardware maintain baseline measurement integrity by isolating internal backplane signals from common-mode voltage spikes and structural thermal shifts.

Frequently Asked Questions

Q: What is the primary structural configuration of the Honeywell 51454460-200 mounting plate?

A: The module features a standard 3-column mounting design configured specifically to align with Honeywell Series 8 system chassis and carrier slots.

Q: Does the 51454460-200 mounting plate consume electrical power from the backplane?

A: No, this unit is a passive structural component that consumes no electrical power and serves strictly as a mechanical support and grounding platform.

Field Installation Guidelines

  1. Ensure panel supply power is isolated and that the mounting surface inside the Series 8 enclosure is clean and free of metal filings or debris.
  2. Position the 51454460-200 mounting plate against the vertical cabinet rack or enclosure rear panel.
  3. Align the structural mounting holes of the 3-column framework with the pre-drilled enclosure pattern.
  4. Install all mounting screws and tighten firmly to ensure mechanical stability and proper protective earth grounding contact.
  5. Mount the corresponding Series 8 IOTA assemblies or chassis modules onto the plate, verifying that all retaining clips latch securely before restoring power to the cabinet.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more