Skip to content

What are you looking for?


You may also like

Honeywell Experion PKS I/O Module | 51454416-100Honeywell Experion PKS I/O Module | 51454416-100Honeywell Experion PKS I/O Module | 51454416-100
Honeywell Experion PKS I/O Module | 51454416-100
Honeywell Experion PKS I/O Module | 51454416-100
Honeywell Experion PKS I/O Module | 51454416-100

Honeywell Experion PKS I/O Module | 51454416-100


Only 10 left - Selling fast

PRODUCT SKU : 51454416-100

PRODUCT TYPE : Input Output Modules

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-speed Ethernet routing and signal handling in DCS / Experion PKS platforms, the Honeywell 51454416-100 (51454416-100 I/O Module) provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model 51454416-100
Brand Honeywell
Origin USA
Weight 0.4 kg
Dimensions 7 cm x 14 cm x 14.5 cm
Operating Temp -40 to +70 deg C
Power Consumption 4.8 W
Input Voltage 24 VDC
Module Type I/O Module / Ethernet Router Interface
Ethernet Ports 2 x 10/100/1000BASE-T
Data Rate Up to 1000 Mbps
Isolation Protection 1500 V AC
Surge Protection +/- 2 kV
Network Capacity 32 simultaneous Modbus TCP connections, 2048 MAC table entries

Channel-to-Channel Isolation & Network Protocol Processing

The module integrates 1500 V AC galvanic isolation and +/- 2 kV surge protection across all network channels to isolate field-side electrical transients from the controller backplane. Operating over a 24 VDC supply, its dual Gigabit Ethernet interface processes 32 simultaneous Modbus TCP connections with signal routing latency under 5 us. The hardware layer enforces channel-to-channel isolation and deterministic data execution within Experion PKS network structures.

Frequently Asked Questions

Q: What level of electrical isolation does the network interface provide?

A: The module incorporates 1500 V AC isolation protection along with +/- 2 kV surge protection on its dual 10/100/1000BASE-T Ethernet channels.

Q: How many simultaneous field network connections can the module maintain?

A: The internal stack supports up to 32 simultaneous Modbus TCP connections and maintains a MAC address table capacity of 2048 entries.

Q: What are the input power constraints for the 51454416-100 unit?

A: The unit requires a regulated 24 VDC power source and operates with a nominal power consumption of 4.8 W.

Field Installation Guidelines

  1. Verify that the primary 24 VDC power supply is isolated and de-energized prior to hardware mounting.
  2. Secure the module housing to the panel rack or mounting rail using standard hardware, maintaining clearance for air dissipation across the -40 to +70 deg C operating range.
  3. Connect category 5e/6 industrial Ethernet cables to the dual RJ-45 ports, ensuring connector retention clips engage completely.
  4. Fasten the frame ground terminal to the main panel enclosure ground bar to optimize surge protection up to +/- 2 kV.
  5. Apply 24 VDC input power and inspect hardware LED indicators to confirm network Link/Activity status on active channels.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more