Skip to content

What are you looking for?


You may also like

DSAO 120A 3BSE018293R1 ABB Analog Output BoardDSAO 120A 3BSE018293R1 ABB Analog Output BoardDSAO 120A 3BSE018293R1 ABB Analog Output Board
DSAO 120A 3BSE018293R1 ABB Analog Output Board
DSAO 120A 3BSE018293R1 ABB Analog Output Board
DSAO 120A 3BSE018293R1 ABB Analog Output Board

DSAO 120A 3BSE018293R1 ABB Analog Output Board


Only 10 left - Selling fast

PRODUCT SKU : DSAO 120A 3BSE018293R1

PRODUCT TYPE : Analog Output Boards

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The ABB DSAO 120A 3BSE018293R1, also cataloged as the DSAO 120A Analog Output Board, operates as a dedicated hardware component for multi-channel analog signal drive and control execution within Advant OCS / Master system architectures.

Hardware Specifications

Parameter Specification
Model DSAO 120A
Order Code 3BSE018293R1
Brand ABB
Origin Sweden
Product Type Analog Output Boards
Output Channels 8 Channels
Dimensions (D x H x W) 324 mm x 27 mm x 234 mm
Weight 0.372 kg
Operating Temp 0 to 55 deg C
Power Consumption Bus-powered via subrack backplane
RoHS Compliance Not RoHS Compliant
WEEE Category 5. Small Equipment (No External Dimension More Than 50 cm)

Backplane Bus Communication & Field I/O Density Scaling

The ABB DSAO 120A board converts digital control values received over the internal subrack backplane into 8 independent analog output channels. High-efficiency signal path design limits cross-channel crosstalk while scaling I/O density inside standard rack assemblies. Built-in address validation logic maintains firmware flash compatibility and deterministic data frame updating across connected controller stations.

Frequently Asked Questions

Q: What channel capacity does the DSAO 120A board provide for analog field control?

A: The board provides 8 physical analog output channels for direct control interface execution.

Q: Can the DSAO 120A board be hot-swapped while the system rack is powered?

A: Module replacement requires de-energizing the subrack or placing the targeted slot into isolated bypass mode to prevent transient interruptions on the backplane communication bus.

Field Installation Guidelines

  1. Power down the system subrack before inserting or extracting the board.
  2. Align the board circuit card with the rack guides and insert firmly until backplane bus pins seat fully.
  3. Tighten captive chassis screws to preserve panel grounding continuity and lock the board against mechanical vibration.
  4. Route field analog output wiring separately from high-voltage AC cables to prevent induced noise coupling.
  5. Earth field cable shields at the designated single-point grounding bar before applying operational power.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Wellhead Control Panel (WHCP) Architecture in Oil and Gas Automation

Wellhead Control Panel (WHCP) Architecture in Oil and Gas Automation

Upstream oil and gas operations rely on specialized field control platforms to manage wellhead extraction safety and hydraulic actuation. A Wellhead Control Panel (WHCP) serves as a dedicated hydraulic and pneumatic power unit designed to operate critical Christmas Tree isolation valves. By interfacing field safety components directly with Programmable Logic Controller (PLC) architecture, a WHCP protects upstream extraction assets against overpressure, catastrophic leaks, and thermal emergencies.

Read more
Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Industrial control system deployments rely on structured signal distribution to bridge field instrumentation with central processing hardware. A marshalling cabinet serves as the vital intermediate connection point between heavy field home-run multi-pair cables and delicate input/output (I/O) modules housed inside Programmable Logic Controller (PLC) or Distributed Control System (DCS) enclosures. By segregating field cable terminations from control hardware, engineers maintain system flexibility, safeguard controller components, and streamline commissioning workflows.

Read more
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more