Skip to content

What are you looking for?


You may also like

ABB 10001584 Cable Assembly ST OutputABB 10001584 Cable Assembly ST OutputABB 10001584 Cable Assembly ST Output
ABB 10001584 Cable Assembly ST Output
ABB 10001584 Cable Assembly ST Output
ABB 10001584 Cable Assembly ST Output

ABB 10001584 Cable Assembly ST Output


Only 10 left - Selling fast

PRODUCT SKU : 10001584

PRODUCT TYPE : Cable Assemblies

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for output signal transmission in ABB DCS and PLC automation hardware, the ABB 10001584 (10001584 Cable Assembly) provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model 10001584
Brand ABB
Origin Canada
Weight 0.5 lb
Dimensions Standard Cable Assembly Length
Operating Temp -20 to 70 deg C
Power Consumption Passive Component (N/A)
Cable Type ST Output Assembly
Voltage Rating Low Voltage Signal Level

Deterministic Network Integration and I/O Density Scaling

The 10001584 cable assembly routes continuous analog and discrete output channels across distributed I/O racks to optimize signal integrity. High-speed backplane bus communication velocity requires strict shield termination to maintain noise immunity within Profinet and EtherNet/IP deterministic networks. The assembly housing design supports high I/O density scaling inside control enclosures while maintaining full firmware flash compatibility during controller configuration syncs.

Frequently Asked Questions

Q: Does the 10001584 cable assembly support hot-swapping during active I/O operation?

A: No, field wiring connections must be de-energized prior to disconnecting the output cable assembly to prevent signal disruption and electrical arc transients.

Q: How is shield grounding handled on this output cable assembly?

A: Cable shield drain wires must be bonded directly to the low-impedance functional earth ground bar inside the enclosure to suppress high-frequency interference.

Field Installation Guidelines

  • Verify that power to the output module and connected field devices is switched off prior to installing or removing the cable connector.
  • Inspect terminal pins and mating sockets for bent contacts or debris before insertion.
  • Ensure cable strain relief clamps are tightened appropriately to avoid physical tension on individual terminal wires.
  • Route the signal assembly away from high-voltage AC power lines and variable frequency drive outputs to eliminate inductive noise coupling.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Industrial control system deployments rely on structured signal distribution to bridge field instrumentation with central processing hardware. A marshalling cabinet serves as the vital intermediate connection point between heavy field home-run multi-pair cables and delicate input/output (I/O) modules housed inside Programmable Logic Controller (PLC) or Distributed Control System (DCS) enclosures. By segregating field cable terminations from control hardware, engineers maintain system flexibility, safeguard controller components, and streamline commissioning workflows.

Read more
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more