Skip to content

What are you looking for?


You may also like

Honeywell FS-BSDOL-04UNI Range-Setting Module SetHoneywell FS-BSDOL-04UNI Range-Setting Module SetHoneywell FS-BSDOL-04UNI Range-Setting Module Set
Honeywell FS-BSDOL-04UNI Range-Setting Module Set
Honeywell FS-BSDOL-04UNI Range-Setting Module Set
Honeywell FS-BSDOL-04UNI Range-Setting Module Set

Honeywell FS-BSDOL-04UNI Range-Setting Module Set


Only 10 left - Selling fast

PRODUCT SKU : FS-BSDOL-04UNI

PRODUCT TYPE : Range Setting Modules

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The Honeywell FS-BSDOL-04UNI, also cataloged as the FC-BSDOL-04UNI Range-Setting Module Set, operates as a dedicated hardware component for output loop range configuration and parameter scaling within Honeywell Safety Manager SC platforms.

Hardware Specifications

Parameter Specification
Model FS-BSDOL-04UNI (FC-BSDOL-04UNI)
Brand Honeywell
Origin USA
Weight 0.4 kg
Dimensions 120 mm x 60 mm x 40 mm
Operating Temp -20 to 70 deg C
Power Consumption < 5 W
Operating Voltage 24 VDC
Range Setting Resolution Up to +/-0.5% accuracy
Channel Support 4 loop-monitored output channels
Communication Interface RS-485
System Compatibility Honeywell Safety Manager SC / SDOL systems

Process Control & DCS Output Scaling Characteristics

The FS-BSDOL-04UNI range-setting module set mounts directly onto the programming connector (Px) of the IO backplane, providing direct hardware-level configuration for four loop-monitored output channels. Featuring integrated channel-to-channel isolation, the module preserves signal integrity across process output interfaces while executing high-accuracy parameter adjustments up to +/-0.5%. The onboard RS-485 communication link provides deterministic parameter transfer without interfering with active 4-20 mA HART loop protocol telemetry or field output driver circuits.

Frequently Asked Questions

Q: How is the FS-BSDOL-04UNI module physically connected to the I/O rack assembly?

A: The module mounts directly onto the dedicated programming connector (Px) located on the IO backplane, establishing secure multi-pin hardware contact without external jumper cabling.

Q: What impact does the RS-485 interface have on active loop monitoring during range adjustment?

A: The RS-485 communication interface executes range-setting commands and parameter readbacks isolated from the analog driver path, allowing continuous monitoring across all four output loops without loop interruption.

Field Installation Guidelines

  1. Backplane Insertion: Align the module header pins with the programming connector (Px) on the IO backplane. Apply uniform pressure until the connector is fully seated to prevent pin distortion.
  2. Grounding & Shielding: Ensure the IO backplane chassis grounding strap connects directly to the cabinet earth bar using a low-impedance copper jumper to isolate the RS-485 communication lines from external noise.
  3. Power Isolation: Verify that the 24 VDC auxiliary supply stays within nominal limits before initiating output channel configuration to maintain +/-0.5% scaling accuracy.
  4. Thermal Spacing: Maintain a minimum 50 mm clearance around the backplane slot area to allow convective heat dissipation across the enclosure within the -20 to 70 deg C operating window.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more