Skip to content

What are you looking for?


You may also like

900CP1-0300 | Honeywell | ControlEdge HC900 Control Processor Module900CP1-0300 | Honeywell | ControlEdge HC900 Control Processor Module900CP1-0300 | Honeywell | ControlEdge HC900 Control Processor Module
900CP1-0300 | Honeywell | ControlEdge HC900 Control Processor Module
900CP1-0300 | Honeywell | ControlEdge HC900 Control Processor Module
900CP1-0300 | Honeywell | ControlEdge HC900 Control Processor Module

900CP1-0300 | Honeywell | ControlEdge HC900 Control Processor Module


Only 10 left - Selling fast

PRODUCT SKU : 900CP1-0300

PRODUCT TYPE : CPU Processors

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The Honeywell 900CP1-0300, also cataloged as the 900CP1 Control Processor Module, operates as a dedicated hardware component for process execution and real-time logic solving within ControlEdge HC900 controller architectures. The module processes system logic and field I/O execution cycles using integrated program and data memory. Multi-protocol industrial Ethernet interfaces allow concurrent deterministic control communication and high-level host telemetry.

Hardware Specifications

Parameter Specification
Model 900CP1-0300
Brand Honeywell
Origin USA
Weight 320 g
Dimensions Standard HC900 rack slot dimensions
Operating Temp -40 to +70 deg C
Power Consumption 24 V DC backplane supply
Architecture High-speed processing engine with integrated storage
Communication Protocols Ethernet/IP, Modbus TCP, PROFINET, OPC UA

4-20 mA HART Loop Protocol & Channel Isolation

The Honeywell 900CP1-0300 central controller manages field process telemetry across analog subsystem racks while maintaining internal channel-to-channel isolation parameters. Digital data extracted via 4-20 mA HART loop protocol passes is mapped directly into local memory arrays for continuous processing. Onboard optical isolation circuits prevent common-mode voltage spikes and external electrical noise on long field wiring runs from entering the central processing core.

Frequently Asked Questions

Q: Does the 900CP1-0300 module support hot-swapping inside a live HC900 rack?

A: Hot-swapping (Removal and Insertion Under Power) requires adherence to HC900 rack hardware guidelines. The controller must be transitioned to a stopped or standby state before physical extraction to avoid backplane bus communication faults.

Q: How are network communications handled if one Ethernet protocol link fails?

A: The module executes concurrent networking stacks (Modbus TCP, PROFINET, Ethernet/IP, OPC UA) independently over its physical layer interfaces, ensuring isolated protocol traffic remains active during partial network drops.

Field Installation Guidelines

  • Ensure total power to the HC900 controller rack chassis is switched off before inserting or seating the 900CP1-0300 module into its rack slot.
  • Verify 24 V DC power polarity and stability prior to energizing the backplane rack assembly.
  • Maintain clean routing separation between network communication Ethernet cables and high-voltage AC field power lines inside wireways to suppress electromagnetic interference.
  • Ground the controller rack chassis to protective earth to enable the full functionality of integrated transient surge protection components.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more