Skip to content

What are you looking for?


You may also like

PanelView Plus 1000 2711P-K10C15D1 | Allen-Bradley Keypad TerminalPanelView Plus 1000 2711P-K10C15D1 | Allen-Bradley Keypad TerminalPanelView Plus 1000 2711P-K10C15D1 | Allen-Bradley Keypad Terminal
PanelView Plus 1000 2711P-K10C15D1 | Allen-Bradley Keypad Terminal
PanelView Plus 1000 2711P-K10C15D1 | Allen-Bradley Keypad Terminal
PanelView Plus 1000 2711P-K10C15D1 | Allen-Bradley Keypad Terminal

PanelView Plus 1000 2711P-K10C15D1 | Allen-Bradley Keypad Terminal


Only 10 left - Selling fast

PRODUCT SKU : 2711P-K10C15D1

PRODUCT TYPE : PanelView Terminal

PRODUCT VENDOR : Allen-Bradley


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Overview
The 2711P-K10C15D1 is an Allen-Bradley PanelView Plus 1000 terminal with keypad interface, providing reliable operator control and monitoring for industrial applications.

Technical Specifications

  • Manufacturer: Allen-Bradley

  • Product Line: PanelView Plus 1000

  • Part Number: 2711P-K10C15D1

  • Display Size: 10.4 inches

  • Display Type: Color active-matrix LCD

  • Input Method: Keypad

  • Communication Protocol: ControlNet

  • Input Power: 18–32 VDC

  • Memory: 64 MB

  • Backlight Model: 2711P-RL10C

  • Communication Cable: 1747-KFC15A

  • Series Compatibility: Ser A, B, C, D, F

  • Product Status: Discontinued/Obsolete

  • Weight: 7.06 lbs (3.20 kg)

Features

  • High-contrast color display for clear visualization of process data

  • Robust keypad input suitable for repetitive operator tasks

  • Compatible with multiple ControlNet-based systems

  • Standard 10.4-inch display size for mid-range HMI applications

Applications

  • Operator interface for medium-scale PLC systems

  • Integration with ControlLogix or SLC systems requiring keypad input

  • Process monitoring, data entry, and machine control

FAQs

Q: Can this terminal be retrofitted in existing PanelView Plus 1000 installations?
A: Yes, it is compatible with the standard series A–F of PanelView Plus 1000 installations.

Q: Is replacement backlight required?
A: The backlight model 2711P-RL10C ensures long-term operation under normal conditions.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Industrial control system deployments rely on structured signal distribution to bridge field instrumentation with central processing hardware. A marshalling cabinet serves as the vital intermediate connection point between heavy field home-run multi-pair cables and delicate input/output (I/O) modules housed inside Programmable Logic Controller (PLC) or Distributed Control System (DCS) enclosures. By segregating field cable terminations from control hardware, engineers maintain system flexibility, safeguard controller components, and streamline commissioning workflows.

Read more
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more