Skip to content

What are you looking for?


You may also like

2711P-RDK10C | Allen-Bradley PanelView Plus 1000 Display Module2711P-RDK10C | Allen-Bradley PanelView Plus 1000 Display Module2711P-RDK10C | Allen-Bradley PanelView Plus 1000 Display Module
2711P-RDK10C | Allen-Bradley PanelView Plus 1000 Display Module
2711P-RDK10C | Allen-Bradley PanelView Plus 1000 Display Module
2711P-RDK10C | Allen-Bradley PanelView Plus 1000 Display Module

2711P-RDK10C | Allen-Bradley PanelView Plus 1000 Display Module


Only 10 left - Selling fast

PRODUCT SKU : 2711P-RDK10C

PRODUCT TYPE : Operator Terminal Display Module

PRODUCT VENDOR : Allen-Bradley


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Product Description

The Allen-Bradley 2711P-RDK10C is a robust display module engineered for the PanelView Plus 1000 operator terminal series. It delivers reliable performance and clear visualization in industrial automation environments.

Technical Specifications

  • Manufacturer Allen-Bradley

  • Product Line PanelView Plus 1000

  • Product Family PanelView Plus / PanelView Plus 6

  • Part Number 2711P-RDK10C

  • Weight 4.00 lbs (1.81 kg)

  • Display Type Color active-matrix TFT

  • Backlight CCFL, minimum 50,000 hours at 25 °C (77 °F)

  • Display Size 10.4 inches

  • Display Area 211 x 158 mm (8.3 x 6.2 in.)

  • Resolution 640 x 480 pixels (VGA)

  • Input Type Keypad

  • Module Type Display Module

  • Compatible Terminals PanelView Plus 1000 models

  • Enclosure Ratings NEMA Type 12, 13, 4X; IP65 or IP54

  • Anti-glare Overlay 2711P-RGK10 (optional accessory)

  • Conformal Coating Not available

  • Removal/Insertion Under Power Not supported

Application Scenarios

  • Suitable for machine control panels requiring clear operator feedback

  • Used in manufacturing process visualization systems

  • Effective for industrial automation monitoring tasks

FAQ

  • Q: Can the display be replaced while powered on?  A: No, removal or insertion under power is not supported.

  • Q: What is the expected backlight lifespan?  A: The CCFL backlight is rated for a minimum of 50,000 hours at 25 °C.

  • Q: Is conformal coating available for harsh environments?  A: No, this model does not include conformal coating.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Industrial control system deployments rely on structured signal distribution to bridge field instrumentation with central processing hardware. A marshalling cabinet serves as the vital intermediate connection point between heavy field home-run multi-pair cables and delicate input/output (I/O) modules housed inside Programmable Logic Controller (PLC) or Distributed Control System (DCS) enclosures. By segregating field cable terminations from control hardware, engineers maintain system flexibility, safeguard controller components, and streamline commissioning workflows.

Read more
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more