Skip to content

What are you looking for?


You may also like

GE IS200TBCIS2C Discrete Input Terminal BoardGE IS200TBCIS2C Discrete Input Terminal BoardGE IS200TBCIS2C Discrete Input Terminal Board
GE IS200TBCIS2C Discrete Input Terminal Board
GE IS200TBCIS2C Discrete Input Terminal Board
GE IS200TBCIS2C Discrete Input Terminal Board

GE IS200TBCIS2C Discrete Input Terminal Board


Only 10 left - Selling fast

PRODUCT SKU : IS200TBCIS2C

PRODUCT TYPE : Terminal Boards

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for discrete signal termination in Mark VIeS control platforms, the GE IS200TBCIS2C (IS200TBCIS2C Terminal Board) provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model IS200TBCIS2C
Brand GE
Power Consumption Passive (Signal distribution)
Terminals 2 x 24-point terminal blocks (TB1, TB2)

Industrial Control and Drives Characteristics

The IS200TBCIS2C serves as a physical interface layer within the Mark VIeS architecture, facilitating the transition from field wiring to backplane bus communication. Deterministic network performance within the Mark VIeS system relies on the integrity of these terminal-to-controller signal paths. Maintaining low-latency connectivity requires that field wiring connections remain secure and free from oxidation. The design includes parallel component rows to manage discrete input signal conditioning, ensuring compatibility with standard firmware flash programming and I/O module scanning sequences utilized in the Mark VIeS ecosystem.

Frequently Asked Questions

Q: Are the TB1 and TB2 terminal blocks interchangeable for field wiring?

A: No. TB1 and TB2 are designated for specific input channels. Consult the system-specific wiring diagrams to ensure field conductors are landed on the correct terminals to match the I/O module configuration.

Q: Can this terminal board be replaced while the I/O module is powered?

A: The board functions as a passive termination point. While physical replacement is possible, any disconnection of field wiring will trigger an open-circuit fault in the corresponding controller input channel. De-energize the associated loop prior to removing or installing field wiring.

Field Installation Guidelines

  • Terminal Tightening: Use an appropriately sized screwdriver to tighten terminal screws. Ensure wire ferrules are used if applicable to prevent strand damage and maintain high-pressure contact.
  • Shielding: Terminate cable shields at the designated ground lugs on the chassis to minimize electromagnetic interference. Avoid routing signal wiring alongside high-voltage power cables to maintain signal fidelity.
  • Mechanical Stability: Ensure the board is firmly seated on the DIN rail or mounting standoffs. Verify that all fasteners are torqued to prevent board vibration, which can lead to intermittent contact in high-vibration environments.
  • Labeling: Utilize the factory-provided white markings on the terminal blocks for verification against system point-to-point diagrams during loop checks.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

The transition of a Programmable Logic Controller (PLC) cabinet from a controlled factory floor to a volatile plant environment represents a critical milestone in factory automation. While a Factory Acceptance Test (FAT) validates standalone hardware compliance under ideal conditions, it cannot replicate real-world process dynamics. Therefore, deploying an industrial automation system requires a rigorous Site Acceptance Test (SAT) to verify total loop integrity, field wiring wiring metrics, and process control parameters before final customer handover.

Read more
Advanced Integration: Master Protocol for VFD Commissioning and Testing

Advanced Integration: Master Protocol for VFD Commissioning and Testing

Deploying variable frequency drives (VFDs) requires precise execution during the initial commissioning phase. Junior automation engineers often find the first power-up sequence intimidating. However, following a rigorous engineering framework ensures equipment safety and system reliability. Proper startup procedures protect both the drive electronics and the connected motor.

Read more
Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Variable Frequency Drives (VFDs) serve as critical assets in modern industrial automation. These power electronic devices regulate electric motors by adjusting the supplied frequency and voltage. Consequently, industries utilize VFDs to reduce energy consumption and optimize process control. Major manufacturers like Siemens, ABB, and Yaskawa design highly efficient drives. However, sustained efficiency requires a rigorous preventive maintenance program.

Read more