Skip to content

What are you looking for?


You may also like

GE DS200TCCBG1B TC2000 Extended Analog I/O BoardGE DS200TCCBG1B TC2000 Extended Analog I/O BoardGE DS200TCCBG1B TC2000 Extended Analog I/O Board
GE DS200TCCBG1B TC2000 Extended Analog I/O Board
GE DS200TCCBG1B TC2000 Extended Analog I/O Board
GE DS200TCCBG1B TC2000 Extended Analog I/O Board

GE DS200TCCBG1B TC2000 Extended Analog I/O Board


Only 10 left - Selling fast

PRODUCT SKU : DS200TCCBG1B

PRODUCT TYPE : Analog Input Output Modules

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for analog signal processing within Mark V turbine control systems, the GE DS200TCCBG1B (DS200TCCB Analog I/O Board) provides direct physical execution of signal conversion and interface management.

Hardware Specifications

Parameter Specification
Model DS200TCCBG1B
Brand GE
Core Performance 80196 CPU, PROM modules, 50-pin I/O connectivity

PLC/DCS Industrial Control Integration

The DS200TCCBG1B integrates into the Mark V control architecture to perform analog data acquisition and signal distribution. The module utilizes an onboard 80196 CPU to manage data processing, relying on specific firmware flash compatibility to maintain synchronization with the turbine control system bus. I/O density scaling is achieved through high-density 50-pin connectors (JCC, JDD), while deterministic network performance is governed by the system's backplane bus communication velocity. Hardware settings are adjusted via physical jumpers (JP1-JP3) to align the board's electrical response with the specific requirements of the connected drive or sensor loops.

Frequently Asked Questions

Q: Are the jumpers on this board software-configurable?

A: No. The DS200TCCBG1B uses physical jumpers to configure hardware settings. Configuration changes must be performed manually by repositioning the jumpers on the designated pins.

Q: Can this module be hot-swapped while the system is powered?

A: No. The module must be de-energized before installation or removal. Hot-swapping can induce voltage spikes that may damage the onboard 80196 CPU or the PROM memory modules.

Q: What is the function of the JTEST and TCQPL connectors?

A: These connectors are reserved for manufacturer-level diagnostics and factory testing. They are typically not utilized during standard field operation or site-level configuration.

Field Installation Guidelines

  • Jumper Configuration: When adjusting jumpers JP1, JP2, or JP3, ensure the shunt is firmly seated across the intended pin pair. Do not use excessive force, as the jumper pins are susceptible to mechanical bending.
  • Connector Integrity: Inspect the 50-pin connectors (JCC and JDD) for bent pins or oxidation before mating. Ensure cables are fully latched to prevent intermittent signal loss during high-vibration operation.
  • Static Management: The board contains sensitive PROM and microprocessor components. Use a grounded wrist strap at all times when handling or configuring the module to prevent electrostatic discharge (ESD) damage.
  • Documentation Adherence: If the module replacement requires changes from default jumper positions, strictly follow the specific technical documentation provided with the hardware to ensure correct loop response.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Why 24V DC Power Supplies Standardize Modern Industrial Automation

Why 24V DC Power Supplies Standardize Modern Industrial Automation

Industrial control cabinets worldwide rely on 24V DC as the universal power standard for field instrumentation, sensors, and controllers. Walk into any manufacturing plant, and you will find PLCs, human-machine interfaces (HMIs), and smart actuators running on extra-low voltage DC. Standardizing on 24V DC enhances operational safety, lowers cabinet footprint, and maintains steady control performance across factory networks.

Read more
Essential Motion Control Commands: A Practical Guide for Engineers

Essential Motion Control Commands: A Practical Guide for Engineers

Automation engineers often rely on precise position and speed control to drive modern factory machinery. Modern industrial systems, such as Programmable Logic Controllers (PLCs) and Distributed Control Systems (DCS), depend heavily on standardized motion instructions. Mastering these commands ensures operational safety, protects mechanical components, and optimizes cycle times across production lines.

Read more
Mastering Modern Industrial Joystick Controls in Heavy Automation

Mastering Modern Industrial Joystick Controls in Heavy Automation

Industrial joysticks play a pivotal role in human-machine interaction across heavy material handling and mobile hydraulics. These tactile controllers translate complex operator movements into precise electrical signals for PLCs, motion controllers, and DCS networks. Consequently, selecting and installing the right joystick architecture ensures operator safety, reduces fatigue, and optimizes equipment performance.

Read more