Skip to content

What are you looking for?


You may also like

Emerson KL3105X1-BA1 DeltaV Process Controller ModuleEmerson KL3105X1-BA1 DeltaV Process Controller ModuleEmerson KL3105X1-BA1 DeltaV Process Controller Module
Emerson KL3105X1-BA1 DeltaV Process Controller Module
Emerson KL3105X1-BA1 DeltaV Process Controller Module
Emerson KL3105X1-BA1 DeltaV Process Controller Module

Emerson KL3105X1-BA1 DeltaV Process Controller Module


Only 10 left - Selling fast

PRODUCT SKU : KL3105X1-BA1

PRODUCT TYPE : Analog Input Module

PRODUCT VENDOR : EMERSON


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The Emerson KL3105X1-BA1, also cataloged as the KL3105X1-BA1 Intrinsically Safe Thermocouple / mV CHARM, operates as a dedicated hardware component for low-voltage analog signal acquisition within DeltaV electronic marshalling subsystems. This unit interfaces directly with millivolt sources and thermal sensors located in hazardous environments, executing direct down-loop signal conditioning and digitizing physical temperatures into process data blocks over the system backplane network.

Hardware Specifications

Parameter Specification
Model KL3105X1-BA1
Brand Emerson
Origin U.S.A.
Weight 0.08 kg
Dimensions Standard CHARM module footprint slot width
Operating Temp -40 deg C to +70 deg C
Power Consumption +6.3 VDC at 0 mA (CHARM Bus), +24 VDC at 23 mA (Field Circuit)
Input Signal Types Thermocouple, millivolt (mV) sensor variables
Shock Resistance 10g 1/2 sine wave for 11 ms
Vibration Resistance 1 mm peak-to-peak from 2 to 13.2 Hz; 0.7g from 13.2 to 150 Hz
Airborne Contaminants ISA-S71.04-1985 Class G3 compliance
Relative Humidity 5% to 95% non-condensing
Terminal Block Key Position C5

Cold Junction Compensation and Channel-To-Channel Isolation

Mechanical execution of this baseplate-mounted component relies on galvanic separation barriers to maintain thermal measurement reliability. The module architecture features cold junction compensation (CJC) capabilities embedded within the terminal tracking blocks to dynamically adjust for reference junction drift. Furthermore, integrated channel-to-channel isolation safeguards the high-precision millivolt conversion circuitry, preventing ground fault currents or low-voltage transient noise on an active thermocouple run from shifting data values on neighboring sensor channels.

Frequently Asked Questions

Q: Does the thermocouple input module support continuous hot-swap procedures while under power?

A: Yes. The hardware is rated for live hot-swap insertion and extraction on an energized carrier baseplate. Internal current limits prevent the generation of signal artifacts or electronic trips across adjacent active CHARM slots during a hardware replacement.

Q: How does the mechanical C5 keying configuration impact field terminal deployment?

A: The C5 terminal block keying assignment acts as a physical safeguard that only allows this specific thermocouple/mV characterization module to sit in the designated slot, preventing high-voltage loops from damaging the sensitive low-voltage measuring circuit.

Field Installation Guidelines

  • Baseplate Slot Insertion: Align the rear terminal guides of the CHARM module perpendicularly with the designated baseplate receptor. Press downward until the dual mechanical retention latches click into place to ensure uniform electrical tracking.

  • Intrinsically Safe Wiring Separation: All low-voltage sensor cables originating from hazardous areas must run through segregated blue wiring ducts. Maintain a minimum distance of 50 mm between intrinsically safe paths and standard non-intrinsically safe power infrastructure.

  • Shield Ground Maintenance: Terminate extension wire shields exclusively at the carrier grounding bar assembly. Implementing a strict single-point grounding layout prevents common-mode noise generation across the sensitive mV sensor tracks.

  • Environmental Control Parameters: For installation sites containing Class G3 airborne contaminants, the marshalling enclosure must maintain positive pressure and keep relative humidity below the 95% non-condensing limit to protect active contacts from degradation.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Industrial control system deployments rely on structured signal distribution to bridge field instrumentation with central processing hardware. A marshalling cabinet serves as the vital intermediate connection point between heavy field home-run multi-pair cables and delicate input/output (I/O) modules housed inside Programmable Logic Controller (PLC) or Distributed Control System (DCS) enclosures. By segregating field cable terminations from control hardware, engineers maintain system flexibility, safeguard controller components, and streamline commissioning workflows.

Read more
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more