Skip to content

What are you looking for?


You may also like

Yokogawa IP91*A Communication ModuleYokogawa IP91*A Communication ModuleYokogawa IP91*A Communication Module
Yokogawa IP91*A Communication Module
Yokogawa IP91*A Communication Module
Yokogawa IP91*A Communication Module

Yokogawa IP91*A Communication Module


Only 10 left - Selling fast

PRODUCT SKU : IP91*A

PRODUCT TYPE : Communication Modules

PRODUCT VENDOR : Yokogawa


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The Yokogawa IP91*A, also cataloged as the IP91 Communication Module, operates as a dedicated hardware component for multi-protocol serial communication and data packet translation within Yokogawa DCS and SCADA networks.

Suffix Breakdown & Model Matrix

Code Element Specification / Description
IP91 Base model designation for industrial serial communication module
*A Style code Revision A specifying terminal pin layout and physical enclosure revision

Hardware Specifications

Parameter Specification
Model IP91*A
Brand Yokogawa
Origin Japan
Weight 0.15 kg
Dimensions Compact panel/slot mount module format
Operating Temp -10 deg C to 60 deg C
Power Consumption 12-24 VDC continuous operating supply
Module Type Communication Module
Supported Protocols Modbus RTU, ASCII, Binary
Serial Interface RS-232C / RS-485 configurable communication lines
System Integration Yokogawa DCS, SCADA, and field instrument networks

Channel-to-Channel Isolation and Multi-Protocol Serial Conversion

The IP91*A module converts raw serial field communications, including Modbus RTU, ASCII, and Binary protocols, into digitized backplane data streams for control system processing. Built-in channel-to-channel galvanic isolation shields internal processing circuits from ground loops and common-mode noise across RS-232C/RS-485 field loops. This isolation maintains signal integrity during high-baud-rate data transmission between field instruments and central DCS controllers.

Frequently Asked Questions

Q: How are communication protocol selections configured on the IP91*A module?

A: Protocol selection between Modbus RTU, ASCII, and Binary modes is established via internal DIP switch configuration settings and system engineering software initialization.

Q: Does the IP91*A module tolerate live insertion or removal during active host operation?

A: Module replacement should only be performed when the module power terminal is de-energized or when the connected communication bus is set to an inactive state to prevent frame corruption on the host network.

Q: What ground potential differences can the internal isolation barrier withstand?

A: The internal galvanic isolation barrier provides dielectric protection up to 1500 VAC between field serial lines and the internal logic power ground.

Field Installation Guidelines

  1. Mounting: Secure the module on a standard 35 mm DIN rail or designated chassis mounting slot. Verify that side retaining latches lock fully to prevent physical dislocation under mechanical vibration.
  2. Power Wiring: Connect a regulated 12-24 VDC auxiliary power supply to the designated power terminals. Verify correct voltage polarity before energizing the unit.
  3. Signal Cabling and Shielding: Route serial communication lines using shielded twisted-pair cables. Terminate cable shields to the cabinet functional earth (FE) bus at a single point to prevent ground loop currents.
  4. Line Termination: Ensure proper 120 ohm bus termination resistors are enabled at both physical ends of RS-485 communication loops to eliminate signal reflections over long cable runs.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more