Skip to content

What are you looking for?


You may also like

IC695ETM001 GE PACSystems RX3i Ethernet ModuleIC695ETM001 GE PACSystems RX3i Ethernet ModuleIC695ETM001 GE PACSystems RX3i Ethernet Module
IC695ETM001 GE PACSystems RX3i Ethernet Module
IC695ETM001 GE PACSystems RX3i Ethernet Module
IC695ETM001 GE PACSystems RX3i Ethernet Module

IC695ETM001 GE PACSystems RX3i Ethernet Module


Only 10 left - Selling fast

PRODUCT SKU : IC695ETM001

PRODUCT TYPE : Ethernet Communication Modules

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-speed network communication and deterministic data transport in PACSystems RX3i control platforms, the GE IC695ETM001 (IC695ETM Ethernet Module) provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model IC695ETM001
Brand GE / GE Fanuc / Emerson
Origin USA
Weight 1.00 lbs (0.45 kg)
Operating Temp 0 to +60 deg C
Power Consumption Backplane Powered (Internal DC Supply Rail)
System Platform PACSystems RX3i
Ethernet Ports 2x 10/100 Mbps Autosensing (8-pin RJ45 Shielded)
Serial Port 1x RS-232 Port (9-pin Female D-sub, 1200 to 115200 bps)
Ethernet Processor Speed 200 MHz
Supported Protocols SRTP, Modbus TCP (Client/Server), EGD, SNTP
Hot-Swappable Yes (Supported under power with Firmware 2.51 or higher)

Backplane Bus Communication Velocity and Firmware Flash Compatibility

The IC695ETM001 handles complex TCP/IP network protocol execution using an onboard 200 MHz Ethernet processor. Offloading SRTP, Modbus TCP, and Ethernet Global Data (EGD) transaction management from the primary controller maintains deterministic backplane bus communication velocity across the RX3i chassis. Onboard non-volatile memory and field-upgradable firmware structures ensure full firmware flash compatibility across PACSystems RX3i CPU revisions, permitting direct integration with compatible backplane units including IC695CHS007, IC695CHS012, and IC695CHS016.

Frequently Asked Questions

Q: What are the backplane firmware requirements for hot-swapping the IC695ETM001 module?

A: Module insertion and removal under power (hot-swap) require the system to run firmware revision 2.51 or higher.

Q: Is the IC695ETM001 compatible with all RX3i central processing units?

A: The IC695ETM001 interfaces with standard PACSystems RX3i modules across universal backplanes, with the exception of the CPE400 controller.

Q: What diagnostic functions are provided by the onboard Station Manager?

A: The Station Manager allows supervisory control, statistic monitoring, event log extraction, and parameter adjustments via either the RS-232 serial port or Ethernet channels.

Field Installation Guidelines

  1. Confirm that the target backplane is an IC695CHS007, CHS012, or CHS016 chassis prior to inserting the module.
  2. Align the IC695ETM001 module circuit board edge with the card guide rails of any available Universal Backplane slot.
  3. Pivot the module firmly into the slot until the backplane connectors seat completely and the top and bottom metal retention clips latch.
  4. Ground all Ethernet cable shielding through shielded RJ45 connectors to prevent noise coupling on 10/100 Mbps lines.
  5. Secure serial cables to the 9-pin female D-connector using terminal retaining screws to maintain connection integrity.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more