Skip to content

What are you looking for?


You may also like

Honeywell 51304540-200 Communication ModuleHoneywell 51304540-200 Communication ModuleHoneywell 51304540-200 Communication Module
Honeywell 51304540-200 Communication Module
Honeywell 51304540-200 Communication Module
Honeywell 51304540-200 Communication Module

Honeywell 51304540-200 Communication Module


Only 10 left - Selling fast

PRODUCT SKU : 51304540-200

PRODUCT TYPE : Communication Modules

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for data transmission within TDC 3000 control architectures, the Honeywell 51304540-200 (51304540-200 LCNE2 Paddle Board) provides direct physical execution of network communication between the Local Control Network (LCN) and station components.

Hardware Specifications

Parameter Specification
Model 51304540-200
Brand Honeywell
Weight 0.43 kg
Module Type LCNE2 Paddle Board
Compatibility TDC 3000 Series

DCS Process Control and Connectivity

The 51304540-200 module acts as a communication interface within the TDC 3000 environment, facilitating data packet routing between the control network and localized station hardware. The assembly features channel-to-channel isolation on the backplane interface, which limits electromagnetic interference (EMI) transmission between the communication bus and local module circuitry. This isolation maintains the integrity of high-speed data frames and prevents backplane-level ground loops from inducing communication errors. By offloading specific communication protocol tasks, the module ensures consistent latency for critical control loops, supporting integration with 4-20 mA HART loop protocol instruments when bridged through the network interface.

Frequently Asked Questions

Q: Does this module support hot-swapping within the TDC 3000 rack?

A: No. The 51304540-200 is not designed for hot-swapping. Removal or installation while the rack is powered will induce bus voltage transients, which may result in communication loss, processor re-initialization, or permanent damage to the board's interface components.

Q: How is the module linked to the LCN network?

A: The module is designed as a paddle board interface that connects directly to the network bus via designated station backplane slots. Ensure all connection pins are free of oxidation and the board is firmly seated to prevent intermittent signal loss.

Field Installation Guidelines

  1. Ensure the station rack is completely de-energized and all power sources are isolated before handling the module.
  2. Align the paddle board with the dedicated backplane slot guides and insert slowly to avoid mechanical stress on the interface pins.
  3. Apply uniform pressure to the board face to seat the edge connector fully into the backplane socket.
  4. Secure any auxiliary retention hardware to the rack frame to maintain mechanical stability and ensure effective grounding of the module chassis.
  5. Confirm network communication status through the station diagnostic interface once the system has been re-powered to verify link synchronization.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more