Skip to content

What are you looking for?


You may also like

FS-SICC-0001/L8 Honeywell Interconnection CableFS-SICC-0001/L8 Honeywell Interconnection CableFS-SICC-0001/L8 Honeywell Interconnection Cable
FS-SICC-0001/L8 Honeywell Interconnection Cable
FS-SICC-0001/L8 Honeywell Interconnection Cable
FS-SICC-0001/L8 Honeywell Interconnection Cable

FS-SICC-0001/L8 Honeywell Interconnection Cable


Only 10 left - Selling fast

PRODUCT SKU : FS-SICC-0001/L8

PRODUCT TYPE : Interconnection Cables

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The Honeywell FS-SICC-0001/L8, also cataloged as the FS-SICC-0001 System Interconnection Cable, operates as a dedicated hardware component for inter-rack signal routing and subsystem communication within Honeywell Safety Manager platforms.

Hardware Specifications

Parameter Specification
Model FS-SICC-0001/L8
Brand Honeywell
Origin United States
Weight 0.35 kg
Dimensions 15.1 cm x 3 cm x 10 cm
Operating Temp -20 to +60 deg C
Power Consumption Passive interconnect assembly (Zero internal power draw)
Cable Type System Interconnection Cable
Cable Length 8 m (indicated by /L8 suffix)
System Compatibility Honeywell Safety Manager / Experion PKS

Process Control & DCS Signal Interconnection Characteristics

The FS-SICC-0001/L8 cable assembly incorporates channel-to-channel isolation principles to suppress signal cross-talk across cabinet boundaries. Featuring integrated copper braid shielding, the cable reduces electromagnetic noise coupling during point-to-point transmission. The physical conductor matrix supports deterministic pass-through for discrete logic signals and 4-20 mA HART loop protocol field telemetry between central processing chassis and field termination assemblies.

Frequently Asked Questions

Q: Can the FS-SICC-0001/L8 cable be disconnected while the host system remains powered?

A: Disconnection during active execution is permissible only within redundant communication loops; removing a single-channel cable interrupts live signal telemetry to the controller.

Q: How is the cable shield terminated to mitigate high-frequency electrical noise?

A: The internal drain wire must be bonded directly to the cabinet main safety earth bar at a single point to prevent ground potential loops from inducing noise on low-voltage signal paths.

Field Installation Guidelines

  1. Cable Routing and Bending: Route the assembly inside dedicated wire raceways. Maintain a minimum static bend radius of 50 mm to protect internal conductors and shielding foil from mechanical degradation.
  2. Connector Alignment: Align connector pins squarely with the target chassis header before applying seating force. Secure all mechanical retention screws to ensure a vibration-proof connection.
  3. Shield Grounding: Crimp the shield drain wire with an insulated ferrule and attach it securely to the master enclosure grounding bar.
  4. Wiring Segregation: Maintain a minimum physical clearance of 30 cm between the system interconnection cable and high-voltage AC distribution conductors.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more
Industrial Networking Essentials: Demystifying Hubs, Switches, and Routers in Control Systems

Industrial Networking Essentials: Demystifying Hubs, Switches, and Routers in Control Systems

Industrial automation relies heavily on robust networking infrastructure to connect programmable logic controllers (PLCs), distributed control systems (DCS), and human-machine interfaces (HMIs). Modern factory automation environments generate vast amounts of real-time operational data across deterministic networks. Understanding the structural differences between hubs, switches, and routers ensures optimal traffic segmentation, minimizes latency, and maintains high network availability.

Read more
Safety Relays in Industrial Automation: Fundamentals, Design Standards, and Fail-Safe Architecture

Safety Relays in Industrial Automation: Fundamentals, Design Standards, and Fail-Safe Architecture

Safety relays form the bedrock of functional safety in modern factory automation, preventing catastrophic equipment failure and protecting plant personnel. While standard electromechanical relays handle basic load switching, they lack the redundant diagnostics required for high-risk industrial environments. Modern industrial automation platforms—including programmable logic controllers (PLCs) and distributed control systems (DCS)—rely on specialized safety relays to monitor field devices and isolate hazards instantly.

Read more