Skip to content

What are you looking for?


You may also like

Yokogawa ANB11D-225/BU2B CENTUM VP Node Unit for Dual-Redundant ESB BusYokogawa ANB11D-225/BU2B CENTUM VP Node Unit for Dual-Redundant ESB BusYokogawa ANB11D-225/BU2B CENTUM VP Node Unit for Dual-Redundant ESB Bus
Yokogawa ANB11D-225/BU2B CENTUM VP Node Unit for Dual-Redundant ESB Bus
Yokogawa ANB11D-225/BU2B CENTUM VP Node Unit for Dual-Redundant ESB Bus
Yokogawa ANB11D-225/BU2B CENTUM VP Node Unit for Dual-Redundant ESB Bus

Yokogawa ANB11D-225/BU2B CENTUM VP Node Unit for Dual-Redundant ESB Bus


Only 10 left - Selling fast

PRODUCT SKU : ANB11D-225/BU2B

PRODUCT TYPE : ESB Bus Node Unit

PRODUCT VENDOR : Yokogawa


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Product Overview

The Yokogawa ANB11D-225/BU2B functions as a high-reliability node unit designed for the CENTUM VP integrated production control system. This unit facilitates seamless communication between the Human Interface Station (HIS) and Field Control Stations (FCS) via a dual-redundant ESB bus. By integrating an optical repeater, it extends signal transmission distances up to 5 km, ensuring robust data integrity across large-scale industrial facilities. We supply this unit as 100% brand new and original factory-sealed equipment.

Part Number Breakdown

The model code ANB11D-225/BU2B follows Yokogawa's modular engineering logic:

Code Segment Technical Definition
ANB11D Node Unit for Dual-Redundant ESB Bus with Optical Repeater
-2 Dual-redundant power supply configuration for 5 km optical transmission
2 220-240 V AC Power Supply requirement
5 Basic type (Non-explosion protection)
BU2B Connector unit equipped with a terminator for the ESB Bus

Technical Specifications

This node unit optimizes fieldbus communication through the following parameters:

  • Manufacturer: Yokogawa

  • Power Requirements: 220 V to 240 V AC (Single-phase)

  • Redundancy: Supports full dual-redundancy for power and communication

  • Transmission Medium: Optical fiber cable for long-distance stability

  • Maximum Distance: 5 km between nodes

  • Component Type: Includes BU2B Connector Unit with built-in terminator

  • Shipping Weight: 12 kg (includes protective industrial packaging)

  • Condition: Brand New, Factory Original

Engineering Advantages

  • Long-Distance Signal Integrity: The integrated optical repeater eliminates electromagnetic interference (EMI) issues common in copper wiring. It allows engineers to bridge vast distances (up to 5 km) without signal degradation or the need for intermediate boosters.

  • Zero-Downtime Power Architecture: The dual-redundant power supply modules prevent system shutdowns. If one power source fails, the secondary module instantly takes the load, maintaining continuous operation of critical industrial processes.

  • Simplified Termination: The BU2B connector unit includes a pre-integrated terminator. This design simplifies the physical layer setup, reduces the risk of reflection errors on the ESB bus, and accelerates the commissioning phase during site installation.

  • Hardened Industrial Durability: Yokogawa builds the ANB11D to withstand the thermal and electrical stresses of control room environments, ensuring a mean time between failures (MTBF) that meets rigorous B2B industrial standards.

FAQs

  • Is this unit compatible with existing CENTUM VP systems?

    Yes, the ANB11D-225/BU2B integrates directly with CENTUM VP R5.01 and higher. It supports standard ESB bus protocols used in Yokogawa’s distributed control system (DCS) architecture.

  • Does the unit require a separate terminator for the ESB bus?

    No. This specific configuration includes the /BU2B suffix, which means the connector unit already contains the necessary terminator. You do not need to purchase or install an external termination resistor.

  • How should I handle the optical ports during installation?

    Always keep the dust caps on the optical connectors until the moment of fiber connection. Even microscopic dust particles can impede the 5 km signal strength. Ensure your fiber optic cables match the multi-mode or single-mode specifications defined in the Yokogawa hardware manual.

 

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
PLC vs. HMI: Distinguishing the Brain from the Interface in Industrial Automation

PLC vs. HMI: Distinguishing the Brain from the Interface in Industrial Automation

In the realm of industrial automation, distinguishing between a Programmable Logic Controller (PLC) and a Human-Machine Interface (HMI) is fundamental. While both devices work in tandem, they serve distinct purposes. The PLC acts as the "brain" of the operation, executing logic, whereas the HMI serves as the "eyes," allowing operators to monitor and interact with the system. Understanding this synergy is essential for any professional designing robust factory automation solutions.

Read more
Selecting the Right Industrial Automation Solution for Modern Manufacturing

Selecting the Right Industrial Automation Solution for Modern Manufacturing

Choosing an effective industrial automation system starts with a thorough process audit. You must identify tasks that are repetitive, labor-intensive, or prone to human error. Not every process requires high-level automation; therefore, prioritize operations that directly impact throughput and quality. By scoping your needs accurately, you avoid over-investing in unnecessary technology. A balanced approach ensures that your capital expenditure aligns with measurable gains in operational efficiency.

Read more
Implementing FIFO and LIFO Data Sequencing in PLC Programming

Implementing FIFO and LIFO Data Sequencing in PLC Programming

Data management serves as a cornerstone of modern industrial automation. Whether tracking materials on a conveyor or managing batch sequences in a process, engineers frequently rely on sequential logic. Two primary structures—First-In-First-Out (FIFO) and Last-In-First-Out (LIFO)—form the bedrock of this data handling. Mastering these blocks allows programmers to optimize complex machine operations efficiently.

Read more