Product Details
Configured for hardware migration and dual-drive system expansion in TDC 3000 process platforms, the Honeywell TP-ZSBHM2-100, also cataloged as the TP-ZSBHM2-100 UPG KIT, HM TO SBHMW/TWODRIVES, provides direct physical/electrical execution.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | TP-ZSBHM2-100 |
| Brand | Honeywell |
| Origin | USA |
| Weight | 3.2 kg |
| Dimensions | Standard TDC 3000 chassis board dimensions |
| Operating Temp | 0 deg C to 60 deg C |
| Power Consumption | 24 VDC backplane powered |
| Module Type | History Module Upgrade Kit |
| System Compatibility | Honeywell TDC 3000 Process Manager / LCN |
| Target Configuration | Single Board History Module with Dual Drives |
| Interface Protocol | Local Control Network (LCN) backplane bus |
4-20 mA HART Loop Protocol & Channel-to-Channel Isolation
The upgrade kit interfaces with the Local Control Network (LCN) backplane to maintain deterministic data archiving across 4-20 mA HART loop protocol field inputs and process variable trends. Built-in channel-to-channel isolation on backplane power rails protects mass storage controllers from electrical noise and voltage spikes generated during drive access cycles. Passive backplane filtering preserves high signal-to-noise ratios during continuous multi-channel history collection and retrieval operations.
Frequently Asked Questions
Q: What primary hardware transition does the TP-ZSBHM2-100 kit perform?
A: The kit upgrades standard legacy TDC 3000 History Modules (HM) to Single Board History Module (SBHM) architecture with dual-drive storage capability.
Q: Is external power required for the TP-ZSBHM2-100 upgrade boards?
A: No, power is drawn directly from the internal 24 VDC / 5 VDC system backplane lines of the TDC 3000 card cage.
Q: Can the dual drives in this configuration be hot-swapped during active system operation?
A: Drive replacement requires following Honeywell TDC 3000 LCN offline/online maintenance protocols to prevent history database corruption or bus errors.
Field Installation Guidelines
- Power down the targeted card cage slot and observe full ESD grounding procedures before inserting the SBHM upgrade board assembly.
- Verify that backplane connector pins are straight and clean prior to sliding the board into the mounting rails.
- Ensure all drive ribbon cables and power harnesses maintain a minimum of 5-thread mechanical engagement on retaining hardware where applicable.
- Bond the chassis ground strap to the main protective earth (PE) bus to ensure noise immunity across disk controller data lines.
Additional Information
- 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
- 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
- 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
- Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
- Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
- Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.































