Skip to content

What are you looking for?


You may also like

Multilin MIFIIPI11E10HI00 | GE Digital Feeder Protection RelayMultilin MIFIIPI11E10HI00 | GE Digital Feeder Protection RelayMultilin MIFIIPI11E10HI00 | GE Digital Feeder Protection Relay
Multilin MIFIIPI11E10HI00 | GE Digital Feeder Protection Relay
Multilin MIFIIPI11E10HI00 | GE Digital Feeder Protection Relay
Multilin MIFIIPI11E10HI00 | GE Digital Feeder Protection Relay

Multilin MIFIIPI11E10HI00 | GE Digital Feeder Protection Relay


Only 10 left - Selling fast

PRODUCT SKU : MIFIIPI11E10HI00

PRODUCT TYPE : Digital Feeder Protection Relay

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Overview

The GE Multilin MIFIIPI11E10HI00 is a microprocessor-based feeder protection relay designed for primary and backup protection in electrical distribution networks. Part of the Multilin MIF II series, it delivers fast, reliable protection and monitoring for feeders and associated breakers.

Protection Features

  • Time-delayed overcurrent protection

  • Instantaneous overcurrent with 2 selectable levels

  • Thermal imaging for load monitoring

  • Cold load pickup detection

  • Breaker failure protection

  • Breaker health monitoring

Interface & Indicators

  • Display: 16 × 2 character LCD

  • LED Indicators: 6 total, with 4 configurable

Technical Specifications

  • Manufacturer: GE Digital

  • Model Number: MIFIIPI11E10HI00

  • Product Type: Digital Feeder Relay

  • Weight: 2.5 kg

  • Mounting: Panel or DIN rail (system dependent)

  • Input Voltage: As per system design (typically 24–48 VDC or AC)

  • Operating Temperature: –20°C to +70°C

  • Communication Protocols: Modbus RTU/ASCII compatible

Applications

Ideal for feeder protection in medium and low voltage distribution networks, including industrial plants, substations, and critical infrastructure.

FAQ

Q1: What is the purpose of cold load pickup detection?
A1: It prevents nuisance tripping when a feeder is re-energized after an outage by accounting for temporary high inrush currents.

Q2: How many LED indicators are configurable?
A2: Four out of six total LED indicators can be configured for system alarms or status notifications.

Q3: Can it monitor breaker health?
A3: Yes, the relay provides real-time diagnostics and breaker status monitoring for predictive maintenance.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Industrial control system deployments rely on structured signal distribution to bridge field instrumentation with central processing hardware. A marshalling cabinet serves as the vital intermediate connection point between heavy field home-run multi-pair cables and delicate input/output (I/O) modules housed inside Programmable Logic Controller (PLC) or Distributed Control System (DCS) enclosures. By segregating field cable terminations from control hardware, engineers maintain system flexibility, safeguard controller components, and streamline commissioning workflows.

Read more
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more