Skip to content

What are you looking for?


You may also like

Honeywell 900H03-0001 HC900 Digital Output ModuleHoneywell 900H03-0001 HC900 Digital Output ModuleHoneywell 900H03-0001 HC900 Digital Output Module
Honeywell 900H03-0001 HC900 Digital Output Module
Honeywell 900H03-0001 HC900 Digital Output Module
Honeywell 900H03-0001 HC900 Digital Output Module

Honeywell 900H03-0001 HC900 Digital Output Module


Only 10 left - Selling fast

PRODUCT SKU : 900H03-001

PRODUCT TYPE : Digital Output Cards

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-voltage AC switching and discrete control execution in Honeywell HC900 architectures, the Honeywell 900H03-0001 (900H03 Digital Output Module) provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model 900H03-0001
Brand Honeywell
Origin USA
Weight 0.75 lbs (0.34 kg)
Dimensions Standard HC900 I/O module footprint
Operating Temp 0 deg C to 60 deg C
Power Consumption Backplane powered via HC900 rack bus
Output Channels 8 isolated AC channels
Nominal Voltage 120/240 VAC
Output Signal Type Discrete AC switching
Product Category PLCs/Machine Control / PLC Module/Rack

Channel-to-Channel Isolation & DCS Integration

The 900H03-0001 module incorporates high-density channel-to-channel isolation across all 8 discrete output channels to prevent line transients from propagating between individual AC field loads. Designed to interface seamlessly alongside 4-20 mA HART loop protocol modules within the same Honeywell HC900 controller rack, the internal switching circuitry controls 120/240 VAC field actuators, motor starters, and solenoids while maintaining galvanic isolation against backplane control logic.

Frequently Asked Questions

Q: What is the operating voltage range for the output channels on the 900H03-0001 module?

A: The module is designed to switch discrete field loads operating at nominal voltages of 120 VAC or 240 VAC.

Q: How does the 900H03-0001 isolate AC load transients from internal backplane logic?

A: Internal optical and galvanic channel-to-channel isolation barriers segregate the high-voltage field wiring terminals from the low-voltage DC backplane logic bus.

Field Installation Guidelines

  1. Isolate and lock out all 120/240 VAC field power circuits before wiring or servicing field terminal blocks on the module.
  2. Route high-voltage AC load lines in dedicated cable trays separated from low-level analog or digital communications wiring to minimize electromagnetic interference.
  3. Torque all field wiring screw terminals to manufacturer torque specifications to prevent loose high-resistance AC contact points.
  4. Verify that the total continuous current draw per channel does not exceed rated module limits under elevated ambient cabinet temperatures.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Industrial automation relies heavily on programmable logic controllers (PLCs) to manage complex manufacturing processes. Many engineers dive straight into programming without mastering the underlying architecture. However, understanding how a PLC CPU executes a program ensures reliable system design. Therefore, mastering the scan cycle optimizes both performance and troubleshooting in modern control systems.

Read more
How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

Establishing a reliable hardware link between a programming terminal and a Siemens SIMATIC controller is essential for engineering workflows. Field engineers rely on distinct physical layers, ranging from legacy serial connections to high-speed Industrial Ethernet protocols. Modern factory automation environments prioritize fast data transfer and seamless driver integration. Selecting the correct connection method simplifies program downloads, online monitoring, and system troubleshooting in complex control systems.

Read more
Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Modern manufacturing is undergoing a rapid technological transformation driven by Industry 4.0 innovations. Technologies like Artificial Intelligence (AI), Machine Learning (ML), and the Industrial Internet of Things (IIoT) are dominating discussions across the factory automation sector. Consequently, many engineers wonder if these advanced digital tools will eventually replace traditional Programmable Logic Controllers (PLCs). However, evaluating the core physics of industrial operations reveals a very different reality for control systems.

Read more