Skip to content

What are you looking for?


You may also like

Honeywell 80366198-100 FTA Bridge CableHoneywell 80366198-100 FTA Bridge CableHoneywell 80366198-100 FTA Bridge Cable
Honeywell 80366198-100 FTA Bridge Cable
Honeywell 80366198-100 FTA Bridge Cable
Honeywell 80366198-100 FTA Bridge Cable

Honeywell 80366198-100 FTA Bridge Cable


Only 10 left - Selling fast

PRODUCT SKU : 80366198-100

PRODUCT TYPE : Communication Cables

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The Honeywell 80366198-100, also cataloged as the 80366198-100 FTA Bridge Cable, operates as a dedicated hardware component for field termination assembly interconnects within Honeywell DCS network structures.

Hardware Specifications

Parameter Specification
Model 80366198-100
Brand Honeywell
Origin USA / As indicated on product packaging
Weight 0.44 lbs (0.20 kg)
Dimensions 1.0 meter cable length
Operating Temp -20 to +70 deg C
Power Consumption Passive interconnect assembly
Voltage Rating 300 VAC
Cable Type Field Termination Assembly (FTA) Bridge Cable
Primary Application FTA-to-I/O module signal routing

4-20 mA HART Loop & Channel-to-Channel Isolation Characteristics

Engineered for field termination assembly linkage, the cable features internal conductor shielding to preserve signal integrity across 4-20 mA HART loops and discrete signal paths. Channel-to-channel isolation is maintained along the cable run by reducing capacitive coupling and high-frequency noise interference between adjacent signal lines. The outer insulation jacket meets 300 VAC ratings, preventing dielectric breakdown when routed alongside low-voltage DC auxiliary power distribution lines.

Frequently Asked Questions

Q: What is the maximum voltage rating permitted across the conductors of this bridge cable?

A: The cable assembly is rated for an insulation dielectric limit of up to 300 VAC.

Q: Can this 1.0 meter cable assembly be spliced or altered in the field?

A: Splicing is not permitted; altering physical wire length or factory-molded connectors compromises shield continuity and channel-to-channel isolation performance.

Q: How are cable shield terminations handled at the Field Termination Assembly (FTA) end?

A: Shield drainage is grounded through the integrated connector backshell directly to the FTA ground plane upon physical pin engagement.

Field Installation Guidelines

  1. Inspect cable insulation and multi-pin connectors for mechanical damage before installation.
  2. Route the 1.0 meter cable through dedicated cable trays, maintaining separation from high-current AC power cables.
  3. Align connector orientation keys on the FTA interface prior to fully seating the plug.
  4. Fasten connector jack-screws or locking clips to ensure a secure vibration-resistant physical bond.
  5. Observe minimum bend radius limits (8 times cable outer diameter) to avoid strain on internal conductors and shield braiding.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
PLC and DCS Control System Spares Strategy: Engineering Guidelines

PLC and DCS Control System Spares Strategy: Engineering Guidelines

Modern factory automation relies on high-speed fiber optic backbones to link distributed control systems across noise-intensive industrial environments. Unlike copper wiring, optical fibers transmit data via light pulses, making them completely immune to electromagnetic interference (EMI). Field engineers must master optical cable joining and fusion splicing techniques to guarantee low-loss data transmission across critical Programmable Logic Controller (PLC) and Distributed Control System (DCS) nodes.

Read more
PLC and DCS Control System Spares Strategy: Engineering Guidelines

PLC and DCS Control System Spares Strategy: Engineering Guidelines

Industrial automation lifecycle management requires robust spare parts planning for Programmable Logic Controller (PLC) and Distributed Control System (DCS) platforms. Plant engineers must correctly categorize spare components during front-end engineering design to maintain high system availability. Miscalculating spare requirements can lead to prolonged unscheduled downtime, project budget overruns, or delayed site commissioning.

Read more
Wellhead Control Panel (WHCP) Architecture in Oil and Gas Automation

Wellhead Control Panel (WHCP) Architecture in Oil and Gas Automation

Upstream oil and gas operations rely on specialized field control platforms to manage wellhead extraction safety and hydraulic actuation. A Wellhead Control Panel (WHCP) serves as a dedicated hydraulic and pneumatic power unit designed to operate critical Christmas Tree isolation valves. By interfacing field safety components directly with Programmable Logic Controller (PLC) architecture, a WHCP protects upstream extraction assets against overpressure, catastrophic leaks, and thermal emergencies.

Read more