Skip to content

What are you looking for?


You may also like

GE VMIACC-5595-208 Reflective Memory Hub AssemblyGE VMIACC-5595-208 Reflective Memory Hub AssemblyGE VMIACC-5595-208 Reflective Memory Hub Assembly
GE VMIACC-5595-208 Reflective Memory Hub Assembly
GE VMIACC-5595-208 Reflective Memory Hub Assembly
GE VMIACC-5595-208 Reflective Memory Hub Assembly

GE VMIACC-5595-208 Reflective Memory Hub Assembly


Only 10 left - Selling fast

PRODUCT SKU : VMIACC-5595-208

PRODUCT TYPE : Reflective Memory Modules

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-speed fiber-optic node interconnection and deterministic data routing in real-time control networks, the GE VMIACC-5595-208 (VMIACC-5595 Reflective Memory Hub Assembly) provides direct physical signal distribution across distributed memory nodes.

Hardware Specifications

Parameter Specification
Model VMIACC-5595-208
Brand GE
Origin USA
Weight 3 kg
Dimensions 241 x 194 x 152 mm
Operating Temp Standard operational thermal envelope
Power Consumption Universal internal power supply driven
Product Type Reflective Memory Modules
Data Rate 2 Gb/s fiber-optic link rate
Port Capacity Up to 8 Small Form-Factor Pluggable (SFP) transceiver ports
System Scalability Cascading architecture supporting up to 256 nodes
Maximum Cable Distance Configurable for link distances up to 10 km
Management Interfaces 1x Ethernet port, 1x RS-232 serial port

Backplane Bus Communication Velocity & Deterministic Networks

The VMIACC-5595-208 hub maintains zero-latency data packet switching across fiber-optic nodes to protect deterministic loop timing in real-time control applications. By serving as an active optical star hub, internal switching circuits manage 2 Gb/s data streams without adding host CPU overhead or bus arbitration delays. The deterministic network architecture ensures synchronous data replication across up to 256 cascaded nodes, maintaining sub-microsecond cross-node update velocity across optical line lengths up to 10 km.

Frequently Asked Questions

Q: How does the hub handle node expansion beyond the onboard 8 SFP ports?

A: Multiple VMIACC-5595 hub assemblies can be cascaded via SFP interconnect links to expand the network topology up to a maximum limit of 256 active nodes.

Q: What remote management access interfaces are provided on the hardware enclosure?

A: Hardware status monitoring and system configuration are accessed locally or remotely via dedicated onboard Ethernet and RS-232 serial communications ports.

Q: Is hot-swapping or replacing individual SFP optical transceivers supported during operation?

A: SFP transceivers can be serviced according to standard optical port insertion rules, provided the active ring loop configuration is bypass-managed via remote administrative commands.

Field Installation Guidelines

  1. Mount the 241 x 194 x 152 mm hub assembly securely inside an industrial enclosure using structural panel fasteners to prevent vibration stress.
  2. Connect the AC power mains to the internal universal power supply terminal block, verifying solid ground bonding to the enclosure chassis earth bar.
  3. Insert compatible SFP transceivers into designated fiber ports and verify clean optical fiber end-faces before latching LC/SC connectors.
  4. Route optical fiber cables with a minimum bend radius of 30 mm, maintaining physical separation from high-voltage AC power wiring to prevent sheath abrasion.
  5. Connect an RS-232 serial cable or Ethernet patch cable to the management port to initialize port routing configurations and monitor link integrity flags.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Industrial automation relies heavily on programmable logic controllers (PLCs) to manage complex manufacturing processes. Many engineers dive straight into programming without mastering the underlying architecture. However, understanding how a PLC CPU executes a program ensures reliable system design. Therefore, mastering the scan cycle optimizes both performance and troubleshooting in modern control systems.

Read more
How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

Establishing a reliable hardware link between a programming terminal and a Siemens SIMATIC controller is essential for engineering workflows. Field engineers rely on distinct physical layers, ranging from legacy serial connections to high-speed Industrial Ethernet protocols. Modern factory automation environments prioritize fast data transfer and seamless driver integration. Selecting the correct connection method simplifies program downloads, online monitoring, and system troubleshooting in complex control systems.

Read more
Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Modern manufacturing is undergoing a rapid technological transformation driven by Industry 4.0 innovations. Technologies like Artificial Intelligence (AI), Machine Learning (ML), and the Industrial Internet of Things (IIoT) are dominating discussions across the factory automation sector. Consequently, many engineers wonder if these advanced digital tools will eventually replace traditional Programmable Logic Controllers (PLCs). However, evaluating the core physics of industrial operations reveals a very different reality for control systems.

Read more