Skip to content

What are you looking for?


You may also like

GE IS420UCSCH1C Mark VIe Quad Core Controller ModuleGE IS420UCSCH1C Mark VIe Quad Core Controller ModuleGE IS420UCSCH1C Mark VIe Quad Core Controller Module
GE IS420UCSCH1C Mark VIe Quad Core Controller Module
GE IS420UCSCH1C Mark VIe Quad Core Controller Module
GE IS420UCSCH1C Mark VIe Quad Core Controller Module

GE IS420UCSCH1C Mark VIe Quad Core Controller Module


Only 10 left - Selling fast

PRODUCT SKU : IS420UCSCH1C

PRODUCT TYPE : CPU Processors

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The GE IS420UCSCH1C, also cataloged as the IS420UCSCH1C Quad Core Controller, operates as a dedicated hardware component for high-speed industrial control execution and model-specific firmware execution within GE Mark VIe IONet platforms.

Hardware Specifications

Parameter Specification
Model IS420UCSCH1C
Brand GE / GE Energy
Origin USA
Weight Approx. 46.8 oz (1.33 kg)
Dimensions H 6.61 in x D 5.90 in x W 2.17 in
Operating Temp -30 to +65 deg C (Storage: -40 to +85 deg C)
Power Consumption 18 VDC to 30 VDC Input Voltage
Processor 1.2 GHz AMD G-Series Quad-Core Microprocessor
Memory 4 GB DDR3-1333 SDRAM
Operating System QNX Neutrino Real-Time OS
Cooling Method Fanless Convection Cooled
Network Interface Dedicated IONet Ethernet Interfaces

Profinet / EtherNet/IP Deterministic Networks and I/O Density Scaling

The IS420UCSCH1C does not utilize a physical backplane rack for I/O module hosting. Instead, it interfaces directly across dedicated IONet Ethernet networks to exchange deterministic control data with distributed Mark VIe I/O packs. This architecture allows flexible I/O density scaling across standalone or redundant controller sets. In multi-controller configurations, all attached I/O networks simultaneously transmit input data to each active node, ensuring seamless failover and state synchronization without loss of process data during maintenance transitions or online firmware flash compatibility cycles.

Frequently Asked Questions

Q: Does the IS420UCSCH1C controller rely on internal batteries or hardware jumpers for startup configuration?

A: No. The IS420UCSCH1C requires no internal battery backup and features a jumperless hardware design, maintaining system settings directly in non-volatile flash memory.

Q: How does the IS420UCSCH1C maintain thermal stability without a cooling fan?

A: Heat generated by the 1.2 GHz quad-core processor is dissipated passively through natural convection cooling, eliminating mechanical fan failure points within the controller enclosure.

Field Installation Guidelines

  1. Fasten the IS420UCSCH1C directly to the designated enclosure mounting base using two mounting screws.
  2. Maintain a minimum clearance of 4.0 inches (101.6 mm) above and below the module frame to allow unrestricted natural air convection.
  3. Establish a direct earth ground link from the chassis grounding terminal to the panel ground bus bar.
  4. Wire 18 VDC to 30 VDC control power to the input terminals, verifying supply voltage tolerances before energizing.
  5. Connect RJ45 Ethernet cables from the dedicated IONet ports directly to the Mark VIe network switches, keeping signal lines isolated from high-voltage AC wiring.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Understanding Instrumentation Control Systems in Modern Industrial Automation

Understanding Instrumentation Control Systems in Modern Industrial Automation

An instrumentation control system (ICS) serves as the central nervous system of modern manufacturing plants and processing facilities. Engineers classify these setups as Electrical, Electronic, or Programmable Electronic Systems (E/E/PES). In practice, an ICS bridges the physical world of industrial machinery with digital decision-making tools. Therefore, understanding its architecture is essential for anyone working in factory automation, process control, or plant safety.

Read more
Mastering Electrical Grounding Fundamentals in Industrial Automation and Control Systems

Mastering Electrical Grounding Fundamentals in Industrial Automation and Control Systems

Electrical grounding is a complex engineering discipline. It requires deep knowledge of soil composition and conductor materials. National Electrical Code (NEC) Article 250 outlines these requirements clearly. Many engineers confuse grounding, earthing, and bonding. Grounding connects circuits to a common reference point. Earthing specifically links equipment directly to the planet. Bonding permanently joins metallic parts to ensure electrical continuity.

Read more
Architectural Blueprint of Industrial Automation and Control Systems (IACS): Standards, Safety, and Remote Operations

Architectural Blueprint of Industrial Automation and Control Systems (IACS): Standards, Safety, and Remote Operations

According to IEC 62443, Industrial Automation and Control Systems (IACS) integrate personnel, hardware, and software. These components collectively influence the safety and reliability of any industrial process. Modern control systems allow extensive remote monitoring and operation. However, enabling remote capabilities introduces complex cybersecurity challenges. Therefore, facility operators must evaluate system functions carefully before expanding connectivity.

Read more