Product Details
Configured for high-reliability energy delivery within Foxboro I/A Series control racks, the Foxboro P0926KK (P0926KK FPM Power Cable) provides direct physical/electrical execution for powering Fieldbus Processor Modules (FPM). Interconnecting 3-pin system supply terminals to downstream module baseplates, it routes 24 VDC bus power to keep system processors operational.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | P0926KK |
| Revision | Rev A |
| Brand | Foxboro / Invensys |
| Origin | USA |
| Weight | 0.25 kg (0.55 lbs) |
| Dimensions | Standard 3-pin cable assembly |
| Operating Temp | -20 deg C to +70 deg C |
| Power Consumption | Passive wiring assembly (0 W) |
| Voltage Rating | 24 VDC / 125 VDC isolation |
| Connector Type | 3-pin to 3-pin system connector |
| Application | FPM Power Cable |
Channel-to-Channel Isolation and Loop Protocol Connectivity
The Foxboro P0926KK power assembly maintains strict electrical separation between redundant DC power distribution buses and adjacent I/O communication pathways. By shielding internal conductors, the cable prevents inductive noise coupling into sensitive 4-20 mA HART loop protocol field channels and thermal sensor wires reliant on cold junction compensation (CJC).
Frequently Asked Questions
Q: What is the connector configuration of the P0926KK power cable?
A: The P0926KK features heavy-duty 3-pin keyway connectors on both ends designed specifically for Foxboro FPM power distribution sockets.
Q: Can the P0926KK cable be installed while the system is powered?
A: Power off the circuit prior to connector insertion or removal to prevent arcing and ensure complete mechanical latch engagement.
Field Installation Guidelines
Verify that main power breakers feeding the FPM baseplate are locked out before installing or replacing the P0926KK cable. Inspect the 3-pin connectors on both cable ends to ensure contacts are clean and free of physical damage or contamination.
Align the connector keyways with the 3-pin power receptacles on the FPM module and power distribution rail. Press until the locking retention clips click into place. Route the cable through wire management channels to ensure the minimum bend radius is maintained and to prevent stress on terminal sockets. Verify that cabinet conduit connections achieve a minimum of 5 full threads of engagement on NPT fittings.
Additional Information
- 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
- 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
- 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
- Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
- Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
- Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.































