Product Details
Configured for power distribution in Foxboro I/A Series system enclosures, the Foxboro P0926KP (P0926KP Power Cable) provides direct physical/electrical execution for routing regulated DC output power from system power supplies to backplane baseplate assemblies. Spanning 183 cm (72 in) in length, it connects primary voltage buses to downstream I/O module rails.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | P0926KP |
| Brand | Foxboro |
| Origin | USA |
| Weight | 0.14 kg (0.30 lbs) |
| Dimensions | 183 cm (72 in) length |
| Operating Temp | -20 deg C to +70 deg C |
| Power Consumption | Passive wiring assembly (0 W) |
| Cable Type | Power Supply Output Cable |
| Application | DC bus power distribution |
| Connector Type | Heavy-duty multi-pin power connector |
Channel-to-Channel Isolation and Loop Protocol Connectivity
The Foxboro P0926KP cable assembly features high-dielectric insulation barriers across all conductors to maintain physical separation between DC power rails and sensitive fieldbus signal channels. This layout prevents switching noise coupling into 4-20 mA HART loop protocol instruments and eliminates voltage drop offsets that affect cold junction compensation (CJC) accuracy on adjacent temperature input modules.
Frequently Asked Questions
Q: What is the primary functional task of the P0926KP cable assembly?
A: The P0926KP delivers regulated DC output power from system power supply units to I/A Series baseplates and rack distribution rails over a 183 cm length.
Q: Can the P0926KP cable be disconnected while the main power supply is energized?
A: De-energize the primary supply feed before removing the cable to prevent electrical arcing and pin contact degradation.
Field Installation Guidelines
Isolate all power feeds to the system cabinet prior to connecting or servicing the P0926KP output cable assembly. Inspect multi-pin connectors on both ends to ensure contacts are clean and free of physical deformation or contamination.
Seat the cable connectors fully into the power supply output header and target baseplate receptacle until side retention latches click firmly into position. Lay the 183 cm cable inside dedicated cabinet wire management ducts, maintaining minimum bend radiuses to prevent internal conductor strain. Secure system earth ground wires to the cabinet frame, and confirm that all conduit penetrations maintain a minimum of 5 full threads of engagement on NPT fittings.
Additional Information
- 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
- 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
- 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
- Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
- Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
- Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.





























