Skip to content

What are you looking for?


You may also like

Foxboro P0926CM Power Supply Link CableFoxboro P0926CM Power Supply Link CableFoxboro P0926CM Power Supply Link Cable
Foxboro P0926CM Power Supply Link Cable
Foxboro P0926CM Power Supply Link Cable
Foxboro P0926CM Power Supply Link Cable

Foxboro P0926CM Power Supply Link Cable


Only 10 left - Selling fast

PRODUCT SKU : P0926CM

PRODUCT TYPE : Electrical Cables

PRODUCT VENDOR : Foxboro


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for power supply interconnection and AC input signal routing in Foxboro rack assemblies, the Foxboro P0926CM (P0926CM Cable Terminal Block) provides direct physical/electrical execution. It establishes stable power distribution across a 0.8 m physical length, linking AC input feeds directly to system terminal blocks and power rails.

Hardware Specifications

Parameter Specification
Model P0926CM
Brand Foxboro
Origin Consult Factory
Weight 0.40 lbs (approximately 0.18 kg)
Dimensions Length: 0.8 m
Operating Temp 0 deg C to 60 deg C
Power Consumption Passive Conductor Link (0 W)
Product Type PLC Module / Rack Accessory
Signal Application AC Input Power Supply Link
Terminal Interface Cable Terminal Block Assembly

4-20 mA HART Loop Protocol and Isolation

Maintaining power rail stability is critical for preventing common-mode voltage fluctuations from propagating into delicate measurement loops. The cable terminal block links power supplies cleanly to rack backplanes, preserving the high noise immunity required for coexistence with 4-20 mA HART loop protocol lines and FOUNDATION Fieldbus / Profibus PA connectivity loops. Proper physical separation and shielding practices ensure that high-voltage AC input lines do not induce transient noise into adjacent low-level analog signal paths.

Frequently Asked Questions

Q: Does the P0926CM cable require active power configuration before installation?

A: No, it is a passive copper cable assembly and must be installed while power source feeds are completely de-energized.

Q: What is the exact physical length of this power supply link cable?

A: The cable has a standardized physical length of 0.8 m.

Q: Are there specific grounding protocols for the terminal block shield connections?

A: Yes, cable shielding must be terminated securely to the designated enclosure earth ground to maintain electromagnetic compatibility.

Field Installation Guidelines

Ensure that all incoming AC power sources are locked out and de-energized prior to handling the power link cable. Route the 0.8 m cable through dedicated electrical raceways away from sensitive communication wiring to prevent capacitive coupling. Verify that terminal block screws are torqued down firmly to prevent high-resistance connections and local overheating under load.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Industrial automation relies heavily on programmable logic controllers (PLCs) to manage complex manufacturing processes. Many engineers dive straight into programming without mastering the underlying architecture. However, understanding how a PLC CPU executes a program ensures reliable system design. Therefore, mastering the scan cycle optimizes both performance and troubleshooting in modern control systems.

Read more
How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

Establishing a reliable hardware link between a programming terminal and a Siemens SIMATIC controller is essential for engineering workflows. Field engineers rely on distinct physical layers, ranging from legacy serial connections to high-speed Industrial Ethernet protocols. Modern factory automation environments prioritize fast data transfer and seamless driver integration. Selecting the correct connection method simplifies program downloads, online monitoring, and system troubleshooting in complex control systems.

Read more
Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Modern manufacturing is undergoing a rapid technological transformation driven by Industry 4.0 innovations. Technologies like Artificial Intelligence (AI), Machine Learning (ML), and the Industrial Internet of Things (IIoT) are dominating discussions across the factory automation sector. Consequently, many engineers wonder if these advanced digital tools will eventually replace traditional Programmable Logic Controllers (PLCs). However, evaluating the core physics of industrial operations reveals a very different reality for control systems.

Read more