Skip to content

What are you looking for?


You may also like

DS200TCEAG1A Emergency Over Speed Board | GEDS200TCEAG1A Emergency Over Speed Board | GEDS200TCEAG1A Emergency Over Speed Board | GE
DS200TCEAG1A Emergency Over Speed Board | GE
DS200TCEAG1A Emergency Over Speed Board | GE
DS200TCEAG1A Emergency Over Speed Board | GE

DS200TCEAG1A Emergency Over Speed Board | GE


Only 10 left - Selling fast

PRODUCT SKU : DS200TCEAG1A

PRODUCT TYPE : Turbine Control Boards

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for turbine protection and frequency monitoring within Mark V Speedtronic systems, the GE DS200TCEAG1A (DS200TCEA Emergency Over Speed Board) provides direct physical/electrical execution of safety-critical speed trip logic.

Hardware Specifications

Parameter Specification
Model DS200TCEAG1A
Brand GE General Electric
Origin USA
Dimensions Standard Mark V PCB footprint
Operating Temp Per Mark V environmental requirements
Power Consumption Backplane rail supply
Components 1 x microprocessor, 3 x fuses, 30 x jumpers

Industrial Control and Firmware Compatibility

The DS200TCEAG1A utilizes a microprocessor-based architecture to monitor turbine rotational frequency and execute emergency shutdown sequences. Firmware flash compatibility is managed via removable PROM modules that house the CPU instruction set. The board assembly requires specific backplane bus communication velocity settings to ensure synchronized monitoring across the turbine control rack. Proper I/O density scaling is achieved through the integration of the TCE board within the protection core, where it interfaces with speed sensors to trigger trip logic based on predefined frequency thresholds.

Frequently Asked Questions

Q: Are PROM modules included with a replacement board?

A: No. Replacement boards are shipped with unpopulated PROM sockets. Users must transfer the original PROM modules from the failed board to the replacement board to ensure identical instruction sets and control logic are maintained.

Q: What is the function of the 30 jumpers on the board?

A: The jumpers are factory-configured to define board address, protection threshold logic, and communication parameters. These should be set to match the configuration of the original board.

Field Installation Guidelines

  • Static Discharge Protection: PROM modules are highly sensitive to electrostatic discharge. Always wear a properly grounded anti-static wrist strap when handling the board or the modules. Ensure the wrist strap clip is attached to a verified earth-grounded metal surface.
  • Module Transfer: When moving PROM modules, verify pin alignment and notch orientation before seating them into the sockets on the new board. Ensure firm, even pressure is applied to avoid bending pins.
  • Fuse Inspection: The board includes 3 fuses for circuit protection. If the board fails to power up or process inputs, check these fuses for continuity before proceeding with further diagnostics.
  • Mounting: Ensure the board is fully seated in the designated Mark V rack slot. Utilize the bayonet connections to lock the board into the chassis, ensuring a secure electrical interface with the backplane.
  • Jumper Verification: Before energizing the system, compare the jumper configuration on the replacement board against the original to ensure identical protection logic is enforced.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Importance of Safety Barriers in PLC and DCS Control Systems

Importance of Safety Barriers in PLC and DCS Control Systems

Process industries handle flammable gases and liquids, making electrical instrumentation a constant ignition risk. Engineers designing PLC and DCS networks must implement strict energy-limiting strategies. Intrinsic Safety barriers provide the critical interface that safeguards automation assets and prevents explosions.
Read more
Static UPS vs. Rotary UPS: Technical Evaluation for Industrial Automation

Static UPS vs. Rotary UPS: Technical Evaluation for Industrial Automation

UPS architecture dictates power reliability in process automation. Unplanned voltage sags cause immediate downtime, making robust power backup essential for PLC and DCS networks. This technical guide evaluates the operational principles, key architectures, and tradeoffs between Static and Dynamic Rotary UPS systems.
Read more
Comprehensive Guide to Noise Types in Industrial Automation and Electronics

Comprehensive Guide to Noise Types in Industrial Automation and Electronics

Signal integrity determines reliability in modern industrial automation. Unwanted electrical noise degrades sensor data, distorts 4-20 mA current loops, and drops fieldbus communications. Engineers working with PLC, DCS, and TSI systems must effectively mitigate these disturbances. This technical guide analyzes key internal and external noise sources affecting control systems.
Read more