Skip to content

What are you looking for?


You may also like

DS200PTBAG1AEC | General Electric | Termination BoardDS200PTBAG1AEC | General Electric | Termination BoardDS200PTBAG1AEC | General Electric | Termination Board
DS200PTBAG1AEC | General Electric | Termination Board
DS200PTBAG1AEC | General Electric | Termination Board
DS200PTBAG1AEC | General Electric | Termination Board

DS200PTBAG1AEC | General Electric | Termination Board


Only 10 left - Selling fast

PRODUCT SKU : DS200PTBAG1AEC

PRODUCT TYPE : Termination Boards

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for field signal interfacing in Mark V turbine control systems, the GE DS200PTBAG1AEC (DS200PTBAG1 Termination Board) provides direct physical electrical termination for field wiring and inter-component signal routing.

Hardware Specifications

Parameter Specification
Model DS200PTBAG1AEC
Brand General Electric
Origin Not specified
Weight 0.6 kg
Dimensions 29.2 cm x 7.6 cm x 2.5 cm
Operating Temp -40 deg C to +85 deg C
Power Consumption Not specified
Core Components 2 terminal blocks (72 terminals each), 3 10-pin connectors, 6 signal terminal posts

Industrial Control & Firmware Compatibility

The DS200PTBAG1AEC facilitates signal distribution within the Mark V control architecture, managing backplane bus communication velocity indirectly through organized field-to-controller signal mapping. As a passive termination interface, the board does not contain firmware-dependent logic; therefore, it does not require firmware flash compatibility. However, consistent I/O density scaling relies on precise wire mapping to the 72-terminal blocks. Ensure all connections remain deterministic by verifying the continuity of the three 10-pin inter-component connectors, as signal latency can be introduced by oxidized contacts or high-resistance mechanical terminations in the field wiring path.

Frequently Asked Questions

Q: Does this termination board support hot-swapping?

A: The board is not designed for hot-swapping. Before maintenance or replacement, all field wiring and inter-component connections must be de-energized to prevent short circuits during the removal of signal wires from the terminal blocks.

Q: Are the 10-pin connectors interchangeable between ports?

A: While the connectors utilize the same 10-pin physical interface, they are application-specific based on the Mark V system configuration. Always tag and document the specific cable location (e.g., J1, J2, J3) prior to disconnection to ensure correct signal routing upon re-installation.

Field Installation Guidelines

  • Physical Mounting: Utilize the designated mounting hole to secure the board to the control panel chassis. Ensure the mounting surface is clean and conductive if the board design requires chassis grounding for EMI shielding.
  • Wiring Practices: Terminate field signal wires into the 72-terminal blocks using appropriate torque settings to prevent loosening under thermal cycling. Use strain relief for all incoming field cables to avoid mechanical stress on the terminal blocks or the PCB itself.
  • Signal Shielding: Ground cable shields at the designated terminal posts provided on the board. Proper grounding of signal shields is required to suppress high-frequency noise that can inject errors into the Mark V control processors.
  • Visual Inspection: Perform periodic inspection of the terminal posts and pin headers for signs of oxidation or environmental corrosion, particularly in high-humidity or industrial atmospheres, to maintain optimal signal conductivity.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Demystifying the DDE Protocol in Legacy Industrial Automation Systems

Demystifying the DDE Protocol in Legacy Industrial Automation Systems

Modern control systems rely heavily on seamless interprocess communication to exchange operational data between software programs. Microsoft first introduced the Dynamic Data Exchange (DDE) protocol in 1987 to enable real-time data sharing. In factory automation, DDE served as an early bridge between control software and Windows desktop applications. Therefore, understanding DDE mechanics provides crucial insights into how legacy industrial networks established software-level connectivity.

Read more
Demystifying CPU Communication Ports in Siemens PLC Architectures

Demystifying CPU Communication Ports in Siemens PLC Architectures

Industrial automation relies heavily on robust data exchange between devices. Without seamless connectivity, field instruments, network switches, human-machine interfaces, and programmable logic controllers cannot coordinate effectively. Therefore, understanding the various CPU communication ports available in Siemens hardware ensures efficient factory automation design and seamless system integration.

Read more
Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Industrial automation relies heavily on programmable logic controllers (PLCs) to manage complex manufacturing processes. Many engineers dive straight into programming without mastering the underlying architecture. However, understanding how a PLC CPU executes a program ensures reliable system design. Therefore, mastering the scan cycle optimizes both performance and troubleshooting in modern control systems.

Read more