Skip to content

What are you looking for?


You may also like

DCP 02 | ABB | Freelance 2000 CPU Module | P 37211-4-0369654DCP 02 | ABB | Freelance 2000 CPU Module | P 37211-4-0369654DCP 02 | ABB | Freelance 2000 CPU Module | P 37211-4-0369654
DCP 02 | ABB | Freelance 2000 CPU Module | P 37211-4-0369654
DCP 02 | ABB | Freelance 2000 CPU Module | P 37211-4-0369654
DCP 02 | ABB | Freelance 2000 CPU Module | P 37211-4-0369654

DCP 02 | ABB | Freelance 2000 CPU Module | P 37211-4-0369654


Only 10 left - Selling fast

PRODUCT SKU : DCP 02 P 37211-4-0369654

PRODUCT TYPE : CPU Processors

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The ABB DCP 02 P 37211-4-0369654, also cataloged as the DCP02 CPU Module, operates as a dedicated hardware component for central processing logic execution within ABB Freelance 2000 automation control platforms.

Hardware Specifications

Parameter Specification
Model DCP 02
Order Code P 37211-4-0369654 (0369654-608-REF)
Brand ABB
Origin Sweden
Product Type CPU Processors
Firmware Version V5.1
Dimensions 17.8 cm x 5.1 cm x 45.7 cm
Weight 0.9 kg
Operating Temp 0 to 55 deg C
Power Consumption Bus-powered via internal chassis backplane
Customs Tariff Number 85389091

Backplane Bus Communication & Deterministic Processing

The ABB DCP 02 CPU module delivers real-time program execution and communication task handling across the Freelance 2000 backplane architecture. High-velocity bus interfaces handle deterministic data exchanges between the processor card and distributed I/O racks, ensuring low system scan times. Firmware flash compatibility (version V5.1) maintains exact memory address mapping and operational synchronization with system rack modules and station controllers.

Frequently Asked Questions

Q: What firmware version is integrated into the DCP02 CPU module hardware?

A: The module executes system tasks under firmware version V5.1.

Q: Can the DCP 02 CPU module be replaced without powering down the rack backplane?

A: System rack power must be completely turned off prior to extracting or inserting the CPU module to prevent backplane bus communication crashes and voltage surge spikes across processor memory components.

Field Installation Guidelines

  1. Power off the main cabinet power supply and verify no voltage is present on the rack chassis.
  2. Align the board edges with the card guides in the designated CPU slot of the rack chassis.
  3. Slide the module straight into the slot until the rear backplane connectors seat firmly with the bus header.
  4. Tighten the retaining screws at the top and bottom of the front panel to lock the module in place and complete the ground continuity loop to the chassis frame.
  5. Reconnect communication interfaces, confirm cabling paths are clear of power lines, and energize system power.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Mastering the Siemens PLC Scan Cycle: How the CPU Executes Automation Programs

Industrial automation relies heavily on programmable logic controllers (PLCs) to manage complex manufacturing processes. Many engineers dive straight into programming without mastering the underlying architecture. However, understanding how a PLC CPU executes a program ensures reliable system design. Therefore, mastering the scan cycle optimizes both performance and troubleshooting in modern control systems.

Read more
How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

How to Connect to Siemens S7 PLCs: 5 Essential Communication Methods

Establishing a reliable hardware link between a programming terminal and a Siemens SIMATIC controller is essential for engineering workflows. Field engineers rely on distinct physical layers, ranging from legacy serial connections to high-speed Industrial Ethernet protocols. Modern factory automation environments prioritize fast data transfer and seamless driver integration. Selecting the correct connection method simplifies program downloads, online monitoring, and system troubleshooting in complex control systems.

Read more
Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Will PLCs Become Obsolete? The Future of Control Systems in Industry 4.0

Modern manufacturing is undergoing a rapid technological transformation driven by Industry 4.0 innovations. Technologies like Artificial Intelligence (AI), Machine Learning (ML), and the Industrial Internet of Things (IIoT) are dominating discussions across the factory automation sector. Consequently, many engineers wonder if these advanced digital tools will eventually replace traditional Programmable Logic Controllers (PLCs). However, evaluating the core physics of industrial operations reveals a very different reality for control systems.

Read more