Skip to content

What are you looking for?


You may also like

ABB DSQC 325 3HAB2241-1 Robotics CPU Board | ABB RoboticsABB DSQC 325 3HAB2241-1 Robotics CPU Board | ABB RoboticsABB DSQC 325 3HAB2241-1 Robotics CPU Board | ABB Robotics
ABB DSQC 325 3HAB2241-1 Robotics CPU Board | ABB Robotics
ABB DSQC 325 3HAB2241-1 Robotics CPU Board | ABB Robotics
ABB DSQC 325 3HAB2241-1 Robotics CPU Board | ABB Robotics

ABB DSQC 325 3HAB2241-1 Robotics CPU Board | ABB Robotics


Only 10 left - Selling fast

PRODUCT SKU : DSQC 325 ЗНАВ2241-1

PRODUCT TYPE : CPU Control Board

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Product Description

The ABB DSQC 325 (3HAB2241-1) CPU Control Board is a critical processing module designed for ABB robotic controllers. Built in the USA, this board provides the computational foundation required for precise robot operation and system-level control. Its compact dimensions and lightweight design make it an efficient spare part for maintaining ABB automation systems.

Technical Specifications

  • Brand: ABB

  • Model: DSQC 325

  • Part Number: 3HAB2241-1

  • Country of Origin: USA

  • Net Weight: 0.2 kg

  • Gross Weight: 0.2 kg

  • Dimensions:

    • Length: 130 mm

    • Width: 191 mm

    • Height: 19 mm

  • Product Type: Robotics CPU Control Board

  • Condition: New

Application Scenarios

  • Central processing unit for ABB robotic controllers

  • Replacement module for ABB systems requiring DSQC 325 compatibility

  • Industrial automation environments demanding reliable computational control

FAQ

Q: What is the primary role of the DSQC325 board?  

A: It functions as the CPU board, managing robotic control and system-level processing.

Q: Where is this product manufactured?  

A: The DSQC 325 is produced in the USA.

Q: Is this part lightweight?  

A: Yes, it weighs only 0.2 kg, making it easy to handle and install.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Mastering Functional Safety Terminology in Industrial Automation

Mastering Functional Safety Terminology in Industrial Automation

In modern process control and factory automation, managing operational risk is a top engineering priority. High-speed machinery, high-pressure vessels, and continuous processes present constant hazards to personnel and equipment. Modern plant operations rely heavily on functional safety strategies to mitigate these risks. This guide breaks down the essential functional safety terminology that every control systems engineer should master.

Read more
Understanding Dry Contacts in PLC Wiring: An Industrial Automation Guide

Understanding Dry Contacts in PLC Wiring: An Industrial Automation Guide

Mastering contact switching principles is essential for reliable control panels. Field devices and PLCs interface through dry or wet contacts. This technical guide examines the mechanics of dry contacts, explores their wiring architectures, and evaluates their key advantages in industrial automation.

Read more
Ultimate Commissioning Checklist for Industrial Automation Systems: An Engineering Guide

Ultimate Commissioning Checklist for Industrial Automation Systems: An Engineering Guide

Commissioning is the most decisive phase of an industrial automation project, transforming control hardware and software into an operational facility. Thorough testing prevents costly startup delays and builds customer confidence. This guide covers essential checklists, electrical standards, and best practices.

Read more