Skip to content

What are you looking for?


You may also like

9905-970 | Woodward | LinkNet 6-Channel Analog Input Module9905-970 | Woodward | LinkNet 6-Channel Analog Input Module9905-970 | Woodward | LinkNet 6-Channel Analog Input Module
9905-970 | Woodward | LinkNet 6-Channel Analog Input Module
9905-970 | Woodward | LinkNet 6-Channel Analog Input Module
9905-970 | Woodward | LinkNet 6-Channel Analog Input Module

9905-970 | Woodward | LinkNet 6-Channel Analog Input Module


Only 10 left - Selling fast

PRODUCT SKU : 9905-970

PRODUCT TYPE : Analog Input Modules

PRODUCT VENDOR : Woodward


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for distributed analog signal acquisition in LinkNet turbine control architectures, the Woodward 9905-970 (9905-970 LinkNet Input Module) provides direct physical/electrical execution of sensor signal conversion.

Hardware Specifications

Parameter Specification
Model 9905-970
Brand Woodward
Dimensions 14 x 11 x 4 inches
Operating Temp -40 to 85 deg C
Power Consumption 24 VDC input
Signal Impedance 33K Ohms
Transient Protection 900 VDC

Actuator Loop Feedback Response

The 9905-970 module functions as a remote node within the LinkNet distributed I/O network, translating field sensor inputs into data packets for the host controller. The module's 33K Ohm input impedance is designed to minimize loading effects on sensitive process instrumentation. Internal circuitry includes transient protection up to 900 VDC to safeguard the module against common electrical surges. To maintain stable actuator loop feedback performance, field cabling must be routed to avoid high-energy electromagnetic interference, and the module address must be correctly synchronized with the network rate group settings in the master controller.

Frequently Asked Questions

Q: What is the primary function of the 24-character LED display on this module?

A: The integrated LED display provides local status indication for the module, including channel activity and error condition reporting, which facilitates diagnostics during field commissioning.

Q: Is this module capable of sustaining operation at the maximum specified temperature of 85 deg C?

A: The module is rated for operation up to 85 deg C. However, ensure that the control cabinet mounting location provides sufficient natural or forced convection to prevent localized heat buildup that could exceed the rated operating temperature at the module surface.

Field Installation Guidelines

  1. Mounting: Secure the module within the panel enclosure using the provided mounting holes. Ensure the 14 x 11 x 4 inch footprint allows for appropriate clearance for communication and signal cabling.
  2. Wiring: Utilize shielded twisted-pair cabling for the LinkNet trunk connection. Connect the signal leads to the terminal blocks, ensuring that polarities are maintained according to the system wiring diagram.
  3. Shielding and Grounding: Terminate cable shields at the designated ground terminal on the control panel to mitigate induced noise and ensure data integrity across the distributed network.
  4. Configuration: Set the internal node addressing switches to match the configuration programmed in the host controller’s software before applying power.
  5. Validation: After installation, verify the LED display status to confirm the module has successfully established communication with the network trunk.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more