Skip to content

What are you looking for?


You may also like

51202971-111 | Honeywell | I/O Link Cable51202971-111 | Honeywell | I/O Link Cable51202971-111 | Honeywell | I/O Link Cable
51202971-111 | Honeywell | I/O Link Cable
51202971-111 | Honeywell | I/O Link Cable
51202971-111 | Honeywell | I/O Link Cable

51202971-111 | Honeywell | I/O Link Cable


Only 10 left - Selling fast

PRODUCT SKU : 51202971-111

PRODUCT TYPE : Interface Cables

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for synchronized data exchange in Honeywell Experion PKS platforms, the Honeywell 51202971-111 (51202971-111 I/O Link Cable) provides direct physical/electrical execution.

Hardware Specifications

Parameter Specification
Model 51202971-111
Brand Honeywell
Origin USA
Weight 0.3 kg
Dimensions 1.5 meters length
Operating Temp -10 to +55 deg C
Power Consumption Passive bus cable assembly
Cable Type Gray header I/O Link drop cable
Drop Capacity 3-drop configuration
Shielding EMI/RFI-resistant shielded construction
Compatibility Honeywell C300 controllers and Series 8 I/O modules

4-20 mA HART Loop Protocol & Channel Isolation

The multi-drop bus topology establishes deterministic data transport pathways between central C300 controller nodes and modular Series 8 I/O carrier bases. Heavy-duty metallic foil and braided EMI/RFI shielding prevent external noise pickup and channel-to-channel isolation degradation caused by high-frequency drive noise or ground potential variations inside the control enclosure. Field transmitter digital signals modulated via 4-20 mA HART loop protocol pass across the link structure without inductive attenuation or edge jitter.

Frequently Asked Questions

Q: What physical module layout does the 3-drop configuration support?

A: The assembly provides three distinct termination drop connectors positioned at 6-inch intervals along the 1.5-meter overall cable length.

Q: How does the cable construction resist electromagnetic interference inside high-voltage cabinets?

A: Integrated EMI/RFI shielding layers envelope the internal conductor pairs to maintain signal fidelity in high electrical noise environments.

Q: Can the cable be hot-plugged into an active C300 I/O bus carrier?

A: Physical insertion requires verifying system backplane bus ground integrity and locking retention connectors to prevent transient disruption during live maintenance.

Field Installation Guidelines

  1. Route the cable along dedicated low-voltage trunk channels, maintaining physical separation from AC power wiring and variable frequency drive leads.
  2. Align the gray header connectors with the mating receptacles on the C300 controller base and Series 8 I/O module carriers.
  3. Push each connector header firmly into place until the side retention latches click to lock the physical connection.
  4. Verify that the cable shield drain connection terminates to the designated cabinet grounding point.
  5. Avoid bending the cable beyond its minimum bend radius limits during installation inside compact enclosure ducting.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Wellhead Control Panel (WHCP) Architecture in Oil and Gas Automation

Wellhead Control Panel (WHCP) Architecture in Oil and Gas Automation

Upstream oil and gas operations rely on specialized field control platforms to manage wellhead extraction safety and hydraulic actuation. A Wellhead Control Panel (WHCP) serves as a dedicated hydraulic and pneumatic power unit designed to operate critical Christmas Tree isolation valves. By interfacing field safety components directly with Programmable Logic Controller (PLC) architecture, a WHCP protects upstream extraction assets against overpressure, catastrophic leaks, and thermal emergencies.

Read more
Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Understanding Marshalling Cabinets in Industrial Control Systems Architecture

Industrial control system deployments rely on structured signal distribution to bridge field instrumentation with central processing hardware. A marshalling cabinet serves as the vital intermediate connection point between heavy field home-run multi-pair cables and delicate input/output (I/O) modules housed inside Programmable Logic Controller (PLC) or Distributed Control System (DCS) enclosures. By segregating field cable terminations from control hardware, engineers maintain system flexibility, safeguard controller components, and streamline commissioning workflows.

Read more
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more