Skip to content

What are you looking for?


You may also like

51155506-120 Honeywell DO Relay Cable Assembly51155506-120 Honeywell DO Relay Cable Assembly51155506-120 Honeywell DO Relay Cable Assembly
51155506-120 Honeywell DO Relay Cable Assembly
51155506-120 Honeywell DO Relay Cable Assembly
51155506-120 Honeywell DO Relay Cable Assembly

51155506-120 Honeywell DO Relay Cable Assembly


Only 10 left - Selling fast

PRODUCT SKU : 51155506-120

PRODUCT TYPE : Cable Assemblies

PRODUCT VENDOR : Honeywell


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for digital output signal routing in PlantCruise by Experion platforms, the Honeywell 51155506-120 (51155506-120 DO Relay Cable Assembly) provides direct physical/electrical execution. It establishes a 20-meter point-to-point interface between controller output channels and field relay modules, driving switching loads across extended cabinet distances.

Hardware Specifications

Parameter Specification
Model 51155506-120
Brand Honeywell
Origin USA
Dimensions 20 m Length
Operating Temp -20 to 70 deg C
Power Consumption Passive Component (0 W)
Cable Type DO (Source) Relay Cable Assembly
Isolation Voltage 1500 V AC
System Compatibility Honeywell PlantCruise by Experion

Channel-to-Channel Isolation & Loop Protocol Integration

The 51155506-120 cable assembly incorporates individual conductor insulation paths that preserve galvanic isolation boundaries between adjacent output circuits. Over its 20-meter length, the cable construction minimizes capacitive coupling and cross-channel cross-talk during discrete switching events. This maintains signal integrity across cabinet enclosures where sourcing relay connections route parallel to 4-20 mA HART loop protocol field wiring.

Frequently Asked Questions

Q: Can the 20-meter 51155506-120 cable assembly be shortened in the field to fit smaller enclosures?

A: Cutting or resplicing factory-molded cable assemblies compromises internal shielding, alters conductor resistance, and invalidates terminal strain relief. The cable must be installed at its factory-terminated length.

Q: Does the 51155506-120 cable assembly support hot-plugging during active controller operation?

A: Connecting or disconnecting the cable while the digital output module is energized can cause inductive arc transients across relay terminals. Power to the associated DO field channels should be de-energized prior to mating or unmating the connector.

Field Installation Guidelines

  1. De-energize all field power sources and output module backplane power before attaching or removing the cable assembly.
  2. Align the connector orientation keys precisely with the interface header on the termination assembly prior to seating.
  3. Route the 20-meter assembly through dedicated low-voltage cable raceways, maintaining a minimum 30 cm separation from high-voltage AC power lines to avoid electromagnetic interference.
  4. Secure the cable harness along the run using cable ties, ensuring bend radii do not exceed factory strain limits to prevent conductor fatigue.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more