Skip to content

What are you looking for?


You may also like

ABB 1KHW001006P0001I/O Module Programmable Logic ControllersABB 1KHW001006P0001I/O Module Programmable Logic ControllersABB 1KHW001006P0001I/O Module Programmable Logic Controllers
ABB 1KHW001006P0001I/O Module Programmable Logic Controllers
ABB 1KHW001006P0001I/O Module Programmable Logic Controllers
ABB 1KHW001006P0001I/O Module Programmable Logic Controllers

ABB 1KHW001006P0001 I/O Module Programmable Logic Controllers


Only 10 left - Selling fast

PRODUCT SKU : 1KHW001006P0001

PRODUCT TYPE : I/O Modules

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The ABB 1KHW001006P0001, also cataloged as the 1KHW001006P0001 I/O Module, operates as a dedicated hardware component for field signal interface routing and system data acquisition within P7LC Control System platforms. Designed as a programmable logic controller interface assembly, this unit processes discrete and analog field signals across dedicated system channels.

Hardware Specifications

Parameter Specification
Model 1KHW001006P0001
Brand ABB
Product Type I/O Modules
System Compatibility P7LC Control System
Core Function PLC I/O Module / Data Exchange
Dimensions 27.8 cm x 19.5 cm x 6 cm
Weight 0.320 kg (320 grams)
Operating Temp 0 to +60 deg C
Power Consumption Sub-rack backplane powered
Origin Sweden

Backplane Bus Interfacing and Deterministic Communications

The 1KHW001006P0001 module interfaces directly with the central backplane bus to establish deterministic networks across expansion racks. High-density edge connectors ensure constant backplane bus communication velocity and prevent signal latencies during I/O scan cycles. Integrated firmware flash compatibility ensures real-time protocol execution and synchronized processing between field sensors and the main controller.

Frequently Asked Questions

Q: How is the 1KHW001006P0001 module interfaced within the P7LC rack assembly?

A: The module connects via multi-pin backplane edge connectors that route signal data and power directly from the host sub-rack chassis.

Q: What environmental temperature limits apply during module operation?

A: Operating parameters require maintaining ambient enclosure temperatures between 0 and +60 deg C with passive convective ventilation.

Q: Does module replacement require re-flashing control firmware?

A: Hardware configuration and firmware flash compatibility are checked automatically by the central controller upon initialization during rack power-up.

Field Installation Guidelines

  1. Disconnect main power to the P7LC sub-rack chassis prior to inserting or removing the I/O module.
  2. Put on an ESD-grounded wrist strap connected to the enclosure frame ground before handling the 0.320 kg module circuit assembly.
  3. Align the module edge guide channels with the designated slot tracks inside the chassis enclosure.
  4. Slide the unit inward firmly until the rear backplane connectors engage fully into the bus motherboard socket.
  5. Tighten all top and bottom retaining screws on the front panel to ensure continuous chassis grounding and mechanical stability under industrial vibration.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more