Skip to content

What are you looking for?


You may also like

Foxboro P0926KK Power Cable AssemblyFoxboro P0926KK Power Cable AssemblyFoxboro P0926KK Power Cable Assembly
Foxboro P0926KK Power Cable Assembly
Foxboro P0926KK Power Cable Assembly
Foxboro P0926KK Power Cable Assembly

Foxboro P0926KK Power Cable Assembly


Only 10 left - Selling fast

PRODUCT SKU : P0926GJ

PRODUCT TYPE : Power Cables and Harnesses

PRODUCT VENDOR : Foxboro


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for high-reliability energy delivery within Foxboro I/A Series control racks, the Foxboro P0926KK (P0926KK FPM Power Cable) provides direct physical/electrical execution for powering Fieldbus Processor Modules (FPM). Interconnecting 3-pin system supply terminals to downstream module baseplates, it routes 24 VDC bus power to keep system processors operational.

Hardware Specifications

Parameter Specification
Model P0926KK
Revision Rev A
Brand Foxboro / Invensys
Origin USA
Weight 0.25 kg (0.55 lbs)
Dimensions Standard 3-pin cable assembly
Operating Temp -20 deg C to +70 deg C
Power Consumption Passive wiring assembly (0 W)
Voltage Rating 24 VDC / 125 VDC isolation
Connector Type 3-pin to 3-pin system connector
Application FPM Power Cable

Channel-to-Channel Isolation and Loop Protocol Connectivity

The Foxboro P0926KK power assembly maintains strict electrical separation between redundant DC power distribution buses and adjacent I/O communication pathways. By shielding internal conductors, the cable prevents inductive noise coupling into sensitive 4-20 mA HART loop protocol field channels and thermal sensor wires reliant on cold junction compensation (CJC).

Frequently Asked Questions

Q: What is the connector configuration of the P0926KK power cable?

A: The P0926KK features heavy-duty 3-pin keyway connectors on both ends designed specifically for Foxboro FPM power distribution sockets.

Q: Can the P0926KK cable be installed while the system is powered?

A: Power off the circuit prior to connector insertion or removal to prevent arcing and ensure complete mechanical latch engagement.

Field Installation Guidelines

Verify that main power breakers feeding the FPM baseplate are locked out before installing or replacing the P0926KK cable. Inspect the 3-pin connectors on both cable ends to ensure contacts are clean and free of physical damage or contamination.

Align the connector keyways with the 3-pin power receptacles on the FPM module and power distribution rail. Press until the locking retention clips click into place. Route the cable through wire management channels to ensure the minimum bend radius is maintained and to prevent stress on terminal sockets. Verify that cabinet conduit connections achieve a minimum of 5 full threads of engagement on NPT fittings.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more
Industrial Networking Essentials: Demystifying Hubs, Switches, and Routers in Control Systems

Industrial Networking Essentials: Demystifying Hubs, Switches, and Routers in Control Systems

Industrial automation relies heavily on robust networking infrastructure to connect programmable logic controllers (PLCs), distributed control systems (DCS), and human-machine interfaces (HMIs). Modern factory automation environments generate vast amounts of real-time operational data across deterministic networks. Understanding the structural differences between hubs, switches, and routers ensures optimal traffic segmentation, minimizes latency, and maintains high network availability.

Read more
Safety Relays in Industrial Automation: Fundamentals, Design Standards, and Fail-Safe Architecture

Safety Relays in Industrial Automation: Fundamentals, Design Standards, and Fail-Safe Architecture

Safety relays form the bedrock of functional safety in modern factory automation, preventing catastrophic equipment failure and protecting plant personnel. While standard electromechanical relays handle basic load switching, they lack the redundant diagnostics required for high-risk industrial environments. Modern industrial automation platforms—including programmable logic controllers (PLCs) and distributed control systems (DCS)—rely on specialized safety relays to monitor field devices and isolate hazards instantly.

Read more