Product Details
The Honeywell 900TCK-0101 serves as the primary 900TCK Terminal Block utilized to execute 36-channel low-voltage signal routing and termination across Honeywell HC900 control platforms.
Hardware Specifications
| Parameter | Specification |
|---|---|
| Model | 900TCK-0101 |
| Brand | Honeywell |
| Origin | USA |
| Weight | 1.06 kg |
| Dimensions | 11 x 5.3 x 6.5 cm |
| Operating Temp | Standard industrial cabinet range (-40 to +85 deg C housing tolerance) |
| Power Consumption | Passive signal routing assembly (0 W internal power consumption) |
| Channel Count | 36 channels |
| Voltage Rating | Up to 600 V |
| Current Rating | 20 A per channel |
| Terminal Type | Screw terminals |
| Mounting Type | PCB or panel-mounted |
| Housing Material | Flame-retardant industrial-grade plastic |
| Product Category | PLCs/Machine Control / Terminal Block Housings |
Channel-to-Channel Isolation & DCS Wiring Integration
The 900TCK-0101 terminal block provides a high-density connection interface for process I/O channels operating on Honeywell HC900 DCS platforms. Rated for up to 600 V and 20 A per channel, the unit provides high electrical isolation across adjacent terminal points to prevent cross-channel interference during low-level analog or discrete voltage transmission. It maintains signal integrity when interfacing field devices using the 4-20 mA HART loop protocol to control module backplanes.
Frequently Asked Questions
Q: What is the maximum current capacity per individual terminal point on the 900TCK-0101?
A: Each individual screw terminal channel is engineered to handle continuous currents up to 20 A at operational voltages up to 600 V.
Q: Does the 900TCK-0101 require external supply voltage to function?
A: No, the 900TCK-0101 is a passive electromechanical termination housing that requires no external DC or AC power supply.
Q: How is the assembly secured within an enclosure or chassis?
A: The module housing supports direct panel mounting or standard internal PCB header interface mounting inside industrial enclosures.
Field Installation Guidelines
- Ensure all field power sources and instrument loop circuits are fully de-energized before connecting or disconnecting conductors.
- Strip wire insulation cleanly without nicking metal cores, and insert conductors securely into the designated screw terminal slots.
- Torque all terminal connection screws to recommended manufacturer standards to maintain gas-tight contact and prevent thermal hot spots.
- Separate high-voltage AC load lines from low-voltage 4-20 mA analog signal wires in distinct panel wiring troughs to avoid noise induction.
Additional Information
- 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
- 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
- 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
- Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
- Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
- Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.































