Skip to content

What are you looking for?


You may also like

2711-T5A8L1 | Allen Bradley | PanelView 550 Operator Terminal2711-T5A8L1 | Allen Bradley | PanelView 550 Operator Terminal2711-T5A8L1 | Allen Bradley | PanelView 550 Operator Terminal
2711-T5A8L1 | Allen Bradley | PanelView 550 Operator Terminal
2711-T5A8L1 | Allen Bradley | PanelView 550 Operator Terminal
2711-T5A8L1 | Allen Bradley | PanelView 550 Operator Terminal

2711-T5A8L1 | Allen Bradley | PanelView 550 Operator Terminal


Only 10 left - Selling fast

PRODUCT SKU : 2711-T5A8L1

PRODUCT TYPE : Operator Terminal

PRODUCT VENDOR : Allen-Bradley


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Product Overview

The Allen Bradley 2711-T5A8L1 functions as a high-performance Human Machine Interface (HMI) within the PanelView Standard 550 series. This unit facilitates seamless operator interaction with PLC systems using a durable 5.5-inch monochrome LCD. It provides a reliable interface for monitoring and controlling industrial automation processes, even in legacy environments. We supply this unit as 100% Brand New and Original, ensuring peak performance and longevity for your critical infrastructure.

Technical Specifications

The following table outlines the essential hardware parameters for the 2711-T5A8L1:

Feature Specification
Manufacturer Allen Bradley
Series PanelView 550
Display Type Monochrome LCD (Blue Mode)
Display Size 5.5-inch (120 x 60 mm)
Resolution 256 x 128 pixels
Input Type Touchscreen (128 touch pixels)
Communication DH+ (Data Highway Plus) & RS-232 Printer Port
Input Voltage 24V DC (18-32 VDC range)
Application Memory 170 KB - 240 KB (Series dependent)
Operating Temp 0 to 55 °C (32 to 131 °F)
Backlight Life Replaceable (Part No. 2711-NL1)

Engineering Advantages

The 2711-T5A8L1 addresses specific industrial challenges through its rugged design and specialized communication protocols:

  • Legacy Integration via DH+: This terminal integrates directly into existing Data Highway Plus networks. It eliminates the need for expensive protocol converters when maintaining older PLC-5 or SLC 500 systems.

  • Space-Efficient Footprint: The compact 5.5-inch display allows engineers to install powerful HMI functionality in cramped control panels where larger screens cannot fit.

  • Touch-Responsive Interface: The 128-pixel touch grid provides tactile feedback and eliminates the need for external keyboards, reducing failure points in dusty or oily environments.

  • Thermal Resilience: The hardware dissipates 29W of heat efficiently, maintaining stable operation in ambient temperatures up to 55°C without requiring dedicated cooling fans.

FAQs

  • Does this unit come with a warranty and is it truly new?

    Yes. We provide this 2711-T5A8L1 as a 100% brand new, original factory unit. It includes our standard industrial warranty to ensure your facility avoids the risks associated with refurbished or used surplus.

  • Can I replace a keypad-only PanelView with this touchscreen model?

    Transitioning from a keypad to a touchscreen (2711-T series) requires a physical cutout change in your panel door. Additionally, you must update the application file in PanelBuilder32 software to convert keypad objects into touch-sensitive objects.

  • What should I check if the backlight fails?

    If the screen appears dark but the unit is powered, the 2711-NL1 backlight lamp has likely reached its end of life. You can replace this component separately without replacing the entire HMI, significantly reducing maintenance costs.

  • Which cable do I need for DH+ communication?

    Standard installations utilize the 2711-NC13 communication cable for reliable data transfer. Ensure you maintain proper shielding to prevent electromagnetic interference (EMI) from high-voltage motor drives nearby.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

FAT vs SAT in Industrial Control Systems: Key Differences and Execution Guide

Industrial control system deployment relies on strict verification protocols to guarantee operational safety, system stability, and regulatory compliance. Commissioning complex Programmable Logic Controller (PLC) racks, Distributed Control Systems (DCS), and Safety Instrumented Systems (SIS) requires two critical milestones: the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT). Both procedures validate that system automation meets design specifications, but they occur at different stages of project execution and target distinct operational risks.

Read more
Hub vs Switch vs Router in Industrial Automation Architecture

Hub vs Switch vs Router in Industrial Automation Architecture

Modern factory automation relies on reliable industrial networking infrastructure to exchange real-time field data across operational technology systems. Engineers often encounter networking hardware like hubs, switches, and routers when integrating Programmable Logic Controllers, Distributed Control Systems, and SCADA monitoring nodes. Although these devices share physical ports, they operate at different layers of the Open Systems Interconnection reference model and deliver distinct traffic management capabilities.

Read more
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more