Skip to content

What are you looking for?


You may also like

General Electric DS200TCPDG2BEC Power Distribution BoardGeneral Electric DS200TCPDG2BEC Power Distribution BoardGeneral Electric DS200TCPDG2BEC Power Distribution Board
General Electric DS200TCPDG2BEC Power Distribution Board
General Electric DS200TCPDG2BEC Power Distribution Board
General Electric DS200TCPDG2BEC Power Distribution Board

General Electric DS200TCPDG2BEC Power Distribution Board


Only 10 left - Selling fast

PRODUCT SKU : DS200TCPDG2BEC

PRODUCT TYPE : Power Distribution Boards

PRODUCT VENDOR : General Electric


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

Configured for power signal routing in Mark V systems, the GE DS200TCPDG2BEC (DS200TCPD Power Distribution Board) provides direct physical execution of voltage distribution across drive internal circuitry.

Hardware Specifications

Parameter Specification
Model DS200TCPDG2BEC
Brand General Electric
Origin USA
Weight 0.8 kg
Dimensions 14.75 cm x 9.50 cm x 3.50 cm
Core Function Drive power signal distribution

Industrial Control & Firmware Compatibility

The DS200TCPDG2BEC manages the distribution of regulated DC and AC voltages to auxiliary drive cards. Backplane bus communication velocity is not applicable to this board, as its primary function is the transmission of raw and regulated power rather than data packets. I/O density scaling is handled via high-current traces designed to interface with various control and power boards within the drive rack. Firmware flash compatibility is not required for this component. Proper operation requires consistent voltage levels from the upstream power supply to ensure downstream stability of the connected drive components.

Frequently Asked Questions

Q: Does the DS200TCPDG2BEC require firmware updates?

A: No. This board is a passive power distribution component. It contains no microprocessors or programmable logic and therefore does not support or require firmware updates.

Q: Can this board be replaced while the drive cabinet is powered?

A: No. Disconnect all primary AC and DC power sources from the drive before attempting removal or installation. The board handles power distribution for multiple circuits, and improper handling while energized poses a risk of electrical shock and damage to connected auxiliary modules.

Field Installation Guidelines

  • Physical Seating: Ensure the board is aligned with the cabinet power bus and firmly secured using the provided mounting hardware. Verify that all power connectors are fully engaged to prevent resistive heating at the contact points.
  • Wiring Verification: Cross-reference the connection points with the cabinet wiring diagram to ensure proper phase and polarity alignment. Incorrect wiring can lead to short circuits or damage to downstream control boards.
  • Shielding and Grounding: Maintain cabinet ground integrity. The board must be mounted in a manner that ensures chassis-to-board grounding, minimizing the potential for electromagnetic noise injection into sensitive control signal paths.
  • Thermal Management: Ensure that airflow within the drive cabinet is not obstructed by cabling routed near the distribution board. Maintain adequate clearance to allow heat dissipation from current-carrying traces.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

Executing a PLC System Site Acceptance Test (SAT): The Definitive Engineering Guide

The transition of a Programmable Logic Controller (PLC) cabinet from a controlled factory floor to a volatile plant environment represents a critical milestone in factory automation. While a Factory Acceptance Test (FAT) validates standalone hardware compliance under ideal conditions, it cannot replicate real-world process dynamics. Therefore, deploying an industrial automation system requires a rigorous Site Acceptance Test (SAT) to verify total loop integrity, field wiring wiring metrics, and process control parameters before final customer handover.

Read more
Advanced Integration: Master Protocol for VFD Commissioning and Testing

Advanced Integration: Master Protocol for VFD Commissioning and Testing

Deploying variable frequency drives (VFDs) requires precise execution during the initial commissioning phase. Junior automation engineers often find the first power-up sequence intimidating. However, following a rigorous engineering framework ensures equipment safety and system reliability. Proper startup procedures protect both the drive electronics and the connected motor.

Read more
Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Optimizing Factory Automation: The Definitive Guide to VFD Preventive Maintenance

Variable Frequency Drives (VFDs) serve as critical assets in modern industrial automation. These power electronic devices regulate electric motors by adjusting the supplied frequency and voltage. Consequently, industries utilize VFDs to reduce energy consumption and optimize process control. Major manufacturers like Siemens, ABB, and Yaskawa design highly efficient drives. However, sustained efficiency requires a rigorous preventive maintenance program.

Read more